My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r , <br /> 2 3.02 INSTALLATION <br /> 3 <br /> 4 A. Surface Preparation: <br /> s <br /> 6 a. Allow new concrete block and concrete to cure for a minimum of thirty days before <br /> 7 being coated. <br /> 8 <br /> s b. Moisture content to be no higher than 15 percent as registered on an electronic <br /> 10 moisture meter. <br /> 11 <br /> 12 c. All cracks, other than hairline cracks to be tuck-pointed or caulked. All voids and bee <br /> 13 holes in masonry units shall be filled. Defective mortar joints shall be routed out and <br /> 14 pointed with mortar, or caulked and tooled. <br /> 15 <br /> 16 d. Remove any soil, mud, efflorescence, excessive mortar, etc. Use •dry' cleaning <br /> 17 method, if possible. If wet cleaning is required, allow adequate time in drying. <br /> 18 <br /> 19 e. Sealer shall be applied under factory supervision, and shall be warranted to perform <br /> r 20 for five years. <br /> 21 <br /> 22 B. Installation: Install the waterproofing in strict accordance with the manufacturer's <br /> 23 recommendations, covering all surfaces where waterproofing will be required to prevent <br /> 24 penetration of moisture through the building shell; install the required protective covering <br /> 25 over the waterproofing to prevent damage during backfill operation. <br /> 26 <br /> 27 <br /> ze <br /> 29 END OF SECTION <br /> r <br /> 1 <br /> 1 <br /> r <br /> rWATERPROOFING <br /> 050694 07100-3 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.