Laserfiche WebLink
r1 SECTION 09901 <br /> 3 FINISH SCHEDULE <br /> 4 <br /> 5 <br /> 6 PART 1 : GENERAL <br /> 7 <br /> 8 1.01 DESCRIPTION <br /> 9 <br /> 10 This Section covers the selection of finishes to be applied to the various portions of the <br /> 11 work. <br /> 12 <br /> 1 13 <br /> 14 PART 2: MATERIALS <br /> 15 <br /> 1 16 2.01 MATERIALS <br /> 17 <br /> 18 The materials and methods of applications are specified in Section 09900. <br /> 19 <br /> zo <br /> 21 PART 3: EXECUTION <br /> 22 <br /> 23 3.01 SURFACES REQUIRING PAINTING <br /> 24 <br /> 25 IN GENERAL, THE FOLLOWING SURFACES ARE TO BE COATED OR PAINTED: <br /> 26 <br /> 27 A. All exposed metal surfaces and piping, interior and exterior. <br /> 28 <br /> 1 29 B. All submerged or buried metal, and some submerged concrete and masonry surfaces, as <br /> 30 scheduled. <br /> 31 <br /> 32 C. All structural and fabricated steel, including tanks and equipment. <br /> 33 <br /> 34 D. The interior of certain tanks and wet wells as specified in the schedule. <br /> 35 <br /> 36 E. All exterior aboveground concrete and masonry, as scheduled. <br /> 37 <br /> 38 F. The interior of certain structures as specified in the Schedule. <br /> 39 <br /> 40 G. Equipment furnished without factory finish surfaces. <br /> 41 <br /> 42 H. Doors, woodwork and architectural items. <br /> 43 <br /> as 3.01 SURFACES NOT REQUIRING PAINTING <br /> 45 <br /> 46 A. Unless otherwise indicated, painting is not required on surfaces in concealed areas and <br /> 47 inaccessible areas such as furred spaces, foundation spaces, utility tunnels, pipe spaces, <br /> 48 and on buried piping. <br /> 49 <br /> 50 <br /> FINISH SCHEDULE <br /> 050694 09901-1 <br />