Laserfiche WebLink
I. The decision of the Owner governs what is acceptable as a substitution. If the Owner considers <br /> it necessary, tests to determine equality of the proposed substitution shall be made, at the <br /> Contractor's expense, by an unbiased laboratory satisfactory to the Owner. Equality will be <br /> judged on the basis of the following: <br /> 1. Conformance with description or performance required. <br /> 2. Equal in quality. <br /> 3. Comparable in operation and maintenance. <br /> 4. Equal in longevity and service under conditions of climate and usage for given application. <br /> 5. Conformance with space allocations. <br /> 6. Comparable in appearance and artistic effect. <br /> 7. Compatible with mechanical and electrical construction of related work without <br /> necessitating changes in detail. <br /> J. No material or equipment shall be allowed to be delivered to the Owner until the submittal for <br /> such items has been reviewed by the Owner and approved. <br /> K. Each submittal shall be bound in a three ring binder, which is sized such that when all material <br /> is inserted the binder is not over 3/4 full. Binder construction shall allow easy removal of any <br /> page without complete manual disassembly, spiral ring type binders are not acceptable. Each <br /> ' binder shall be appropriately labeled on the outside with the project name, job number, <br /> equipment Contractor's name, specification section(s), and major material contained therein. An <br /> index shall be provided at the front of all sections which itemizes the contents of each tab and <br /> subtab section and lists the project name, job number and equipments Contractor's name, <br /> address, phone number, and contact person. Drawings that are "C" or "D" size shall be folded <br /> with the title block visible and placed in clear plastic pockets. FAXed documents shall no be <br /> used in any manuals. <br /> 1 <br /> ENGINE GENERATOR <br /> 11500 - 7 <br /> r <br /> r <br />