Laserfiche WebLink
1 be measured at the start and again after 24 hours. No leakage will be allowed. The <br /> 2 Contractor is responsible for disposal of the water and shall coordinate with the Owner <br /> 3 prior to draining. <br /> 1 a <br /> s <br /> 6 PART 3: EXECUTION <br /> / 7 <br /> a 3.01 INSTALLATION <br /> 9 <br /> 10 Handle and install all tanks in accordance with the manufacturer's recommendations. The <br /> 11 Contractor shall assume all loss of warranty due to improper handling or installation. Upon <br /> 12 arrival the tanks shall be inspected for defects and damage. <br /> 13 <br /> 14 <br /> 16 <br /> 16 <br /> 17 END OF SECTION <br /> r <br /> t <br /> 1 <br /> 1 <br /> CHEMICAL STORAGE TANKS <br /> 091294 13416-5 <br /> 1 <br />