My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ' 1 2. Pipelines located in or under fill areas shall not be placed until the fill has been <br /> 2 constructed and compacted to an elevation at least two (2) feet above the elevation <br /> 3 of the top of pipe. <br /> 1 4 <br /> 5 3. All backfill for pipe lines installed under structures, slabs, footings, and paving shall be <br /> 6 made with sand and fine gravel, thoroughly compacted in place to not less than 95% <br /> 7 of maximum density. <br /> 8 <br /> s B. Grades and elevations <br /> io <br /> > 1. All piping and appurtenances shall be installed in the position and to accurate lines, <br /> 12 elevations, and grades as shown on the plans or specified herein. Where possible, <br /> 13 piping shall be sloped to permit complete drainage. All pipelines shall be rigidly <br /> 14 supported and braced by approved hangers, brackets, or other devices. When <br /> 15 temporary supports are used, they shall be sufficiently rigid to prevent any shifting or <br /> 16 distortion of the piping or related work. <br /> 1 " <br /> 1e 2. Furnish all fittings necessary for the satisfactory alignment and arrangement of piping <br /> 19 and all necessary unions and cleanouts. <br /> 20 <br /> 21 3. An invert grade rod shall be used in laying all lines below ground with the exception <br /> 22 of water supply lines. <br /> 23 <br /> 24 C. Flexible couplings <br /> 2s <br /> 26 1. Flexible couplings shall be installed where shown on the drawings and at such other <br /> 27 points as may be required for ease of installation or removal of the pipe, subject to <br /> 28 approval of the Engineer. Where necessary to prevent separation of pipe due to <br /> 29 internal pressures, flexible couplings shall be of the type with set screws in the retainer <br /> 30 gland or shall be provided with tie rods. Where permanent flexibility is required, <br /> 1 31 however, such as at connections to pumps or other equipment, and elsewhere as <br /> 32 called for on the drawings, tie rods shall be the only acceptable restraining devices <br /> 33 and shall be installed through separate mounting plates or lugs and not through flange <br /> ' 34 bolt holes, in order to retain flexibility. <br /> 35 <br /> 36 2. Where rubber or similar flexible couplings are called for on the Drawings, tie rods shall <br /> 37 be provided it recommended by the manufacturer to prevent excessive elongation. <br /> 38 <br /> 39 D. Flexible joints <br /> 40 <br /> 41 1. For pipe lines extending from a concrete structure into earth, at least two flexible joints <br /> 42 shall be provided in the earth within 3 feet of the structure face, one of which may be <br /> 43 cast in structure with end flush with structure face. Piping beyond structure shall <br /> 44 adequately supported by proper compaction under pipe or by supporting on firm <br /> 45 undisturbed soil if necessary. <br /> 46 <br /> 47 2. PVC piping extending from a concrete structure (including manholes, etc.) into earth <br /> 48 shall be provided with a rubber flexible connection, Redflex P-5, Mercer Rubber <br /> 49 "Vibraflex", or connecting hose, "Yosemite" by American Rubber, Gates 35W, attached <br /> 50 with stainless steel clamps, or equal. <br /> 57 <br /> sz <br /> GENERAL PROCESS AND ONSITE UTILITY PIPING PROVISIONS <br /> 050694 15010-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.