My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MATERIAL SIZE SPACING <br /> 2 PVC Pipe 1" and smaller 4 feet <br /> 3 1-1/4" to 2" 4-1/2 feet <br /> 1 4 2-1/2" to 3-1/2" 5 feet <br /> s PVC Pipe (cont.) 4" to 5" 6 feet <br /> 6 6" and larger 7 feet <br /> 7 Ductile iron pipe All sizes 5 feet <br /> ' e <br /> s 2. Where building structure does not permit the specified spacing the Contractor shall <br /> 10 provide additional adequate support. Location and details shall be submitted for <br /> 11 approval. <br /> 12 <br /> 13 3.02 ELECTRICAL CONDUIT SUPPORT <br /> 14 <br /> 15 See also Division 16 <br /> 16 <br /> 17 3.03 DUCTWORK SUPPORT <br /> 1e <br /> 19 The support type detail used will be as shown on the drawings. The spacing and frequency <br /> 20 of support details will be as required by the latest SMACNA guide. <br /> 21 <br /> 22 3.04 MISCELLANEOUS HARDWARE <br /> 23 <br /> 24 Support as shown. When not shown, support as required to form a solid, rigid, strong <br /> 25 installation satisfactory to the Engineer. <br /> 26 <br /> 27 3.05 GALVANIZING TOUCH-UP <br /> 28 <br /> 29 Cold Galvanize all field cut bare metal not designated to be painted. <br /> 30 <br /> 31 <br /> 32 <br /> 33 <br /> 34 <br /> 35 END OF SECTION <br /> r <br /> r <br /> r <br /> HANGERS AND SUPPORTS <br /> 042894 15094-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.