My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
unless specifically stated otherwise. Where "as directed" , "as <br /> permitted" , "approved" , or words of similar import are used, it <br /> shall be understood that the direction , permission , <br /> requirements, or acceptance of the Engineer is intended unless <br /> stated otherwise. As used herein, "provide" shall be understood <br /> to mean "furnish and install" , that is , "provide complete in <br /> place" . <br /> G1.12 Work . The work specified, indicated, shown or contemplated <br /> in this contract to construct the improvements so that the <br /> completed work shall comply with the true meaning and intent of <br /> the plans, specifications, and all provisions of the contract. <br /> ' G1.13 Working Day. Any day except Saturdays , Sundays, or legal <br /> holidays and days on which the Contractor is specifically <br /> required by the Special Provisions, by his labor contract, or <br /> by law, to suspend construction operations. Also excepted is <br /> any day on which the Contractor is prevented by inclement <br /> weather , or conditions resulting therefrom, from proceeding <br /> with at least seventy-five percent (758) of the normal labor <br /> and equipment force for at least five hours toward completion <br /> of the current controlling operation or operations. <br /> Should the conditions prevent the work from beginning at <br /> the usual starting time , or prevent the Contractor from <br /> proceeding with Seventy-five percent (758) of the normal labor <br /> ' and equipment force for a period of at least five hours , and <br /> the crew is dismissed as a result thereof , he will not be <br /> charged for a working day whether or not conditions change so <br /> that the major portion of the day could be considered to be <br /> suitable for such operation or operations. <br /> G1.14 Calendar Day. Calendar day shall be defined as every day <br /> shown on the calendar , Sundays and holidays included. When the <br /> time for completion in the Special Provisions is set forth in <br /> Calendar Days , each and every reference to working days in <br /> these specifications shall be deemed to mean Calendar Days. <br /> G1. 15 Special Provisions . The Special Provisions are specific <br /> clauses setting forth conditions or requirements peculiar to <br /> the work and supplementary to the General Conditions and <br /> technical specifications. <br /> G1. 16 Proposal. The offer of the bidder for the work when made out <br /> and submitted on the prescribed proposal form, properly signed <br /> and guaranteed. <br /> G1. 17_Specifications . Specifications include the Special <br /> Provisions , General Conditions , and Technical Provisions <br /> applicable to this work, and all modifications incorporated in <br /> these documents. <br /> G-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.