My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and the Engineer as additional insureds as their respective , <br /> interests may appear , and certified copies of such policies <br /> shall be filed with the Agency . The maximum deductible <br /> allowable under the Builder ' s All Risk policy shall be 15 , <br /> percent of the contract amount or one hundred fifty thousand <br /> dollars ($150 , 000 . 00) whichever is less , for each and every <br /> loss. The bidder shall have the financial capability to absorb , <br /> such a deductable amount. The Agency reserves the right to <br /> require demonstration of such financial capability prior to <br /> execution of the contract. <br /> In accordance with provisions of California Government Code , <br /> Section 4150 , Builder ' s Risk Insurance is not required for <br /> coverage of losses in excess of 5 percent of the contract ' <br /> amount of damage resulting from earthquake in excess of a <br /> magnitude of 3. 5 on the Richter scale, or tidal waves. Coverage <br /> in the amount of 5 percent of the contract amount for such <br /> losses is required. ' <br /> 4. SCOPE AND INTENT OF CONTRACT <br /> G4. 01 Intent of Plans and Specifications. It is the intent of i <br /> these specs stations and the contract drawings that the work <br /> performed under the contract shall result in a complete <br /> operating system in satisfactory working condition in respect <br /> to the functional purposes of the installations , and no extra <br /> compensation will be allowed for anything omitted but fairly <br /> implied. The prices paid for the various items in the proposal , <br /> shall include full compensation for furnishing all labor , <br /> materials, tools, equipment and incidentals and doing all work <br /> necessary to complete the finished product as provided in the , <br /> plans and these specifications. <br /> The specifications and the contract drawings are intended to <br /> be explanatory of each other . Any work shown on the contract ' <br /> drawings and not in the specifications, or vice versa, is to be <br /> executed as if indicated in both . In case of conflict , the <br /> specifications shall govern over the contract drawings, and the ' <br /> special provisions shall govern over both the contract drawings <br /> and other parts of the specifications , unless the intent is <br /> reasonably obvious . In case of conflict within either the <br /> specifications , or contract drawings , the Contractor shall ' <br /> notify the Engineer for interpretation or correction, and shall <br /> conform thereto as part of the contract. All work shown on the <br /> contract drawings the dimensions of which are not figured , , <br /> shall be accurately followed to the scale to which the drawings <br /> are made; however , figured dimensions are in all cases to be <br /> followed though they differ from scaled measurements. <br /> Any work for which there are no contract drawings shall be <br /> performed in accordance with the provisions of the State <br /> Specifications. , <br /> G-12 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.