Laserfiche WebLink
j <br /> shall require that 1) securities of equal or greater value ' <br /> shall be deposited for release of amounts withheld , 2) the <br /> escrow agent shall convert such securities to cash and deliver <br /> such cash to the Agency immediately upon receipt by the escrow <br /> agent of a signed direction of the Agency that the Contractor <br /> has failed to perform all or part of this agreement after <br /> notice , and specifying the amount of cash to be delivered to ' <br /> the Agency, and 3 ) the escrow agent may not release any <br /> securities to the Contractor until such time as the escrow <br /> agent is notified in writing that the Contract is complete and <br /> the time for filing of stop notices has expired, at which time <br /> the Agency shall direct the release of all such securities <br /> except as necessary to secure the claims of any timely stop <br /> notice claimants. Any such escrow agreement shall be in form <br /> satisfactory to the Agency. <br /> Progress payments will not constitute an acceptance of the <br /> work or any part thereof , or as a waiver of the right of the <br /> Agency to require fulfillment of all terms of the contract. <br /> G8. 06 Final inse_g ction and Acceptance of Work . The Contractor <br /> shall notify the Engineer in writing of the completion of the <br /> work or portion thereof , and the Engineer shall promptly <br /> inspect the work. The Contractor or his representatives may be , <br /> present at the final inspection . The Contractor will be <br /> notified in writing of any defects or deficiencies to be <br /> remedied . The Contractor shall proceed to correct such defects <br /> or deficiences . When notified that this work has been <br /> dompleted , the Engineer will again inspect the work to satisfy <br /> himself that all work has been done in accordance with the <br /> contract drawings and these specifications , and will either <br /> notify the Contractor that further corrections are needed, or <br /> if satisfied as to the actual completion of the work in <br /> accordance with the terms of the contract, shall thereupon , <br /> recommend to the Agency that the work , or substantially <br /> completed protions thereof, is acceptable. <br /> Final determination of the suitability of the work shall be , <br /> made by the Agency . Upon acceptance of the work , the Agency <br /> shall immediately file a Notice of Completion , or a Partial <br /> Completion Certificate in the case of substantially completed <br /> portions. Takeover of substantialy completed protions shall be <br /> at the Agency ' s option . The conditions of guaranty shall <br /> commence immediately upon takeover by the Agency and completion <br /> of any list of deficiencies that may be outstanding . <br /> For specific pieces of equipment or processes for which <br /> operational performance tests are required, acceptance will be <br /> issued only after satisfactory completion of required operating <br /> periods as specified in the Special Provisions. <br /> G8 .07 Final Estimate and Payment . As soon as possible after the , <br /> G-42 <br />