My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013242
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
27865
>
2600 - Land Use Program
>
PA-0200370
>
SU0013242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 9:49:26 AM
Creation date
5/7/2020 3:21:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013242
PE
2605
FACILITY_NAME
PA-0200370
STREET_NUMBER
27865
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
Zip
95320-
APN
24723009
ENTERED_DATE
5/5/2020 12:00:00 AM
SITE_LOCATION
27865 E RIVER RD
RECEIVED_DATE
5/5/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA- 0200370 <br /> The Reed Leasing Group <br /> (c/o George Reed , Inc . ) <br /> Revisions of Approved Actions for Quarry Excavation Application No. PA-0200370 was approved by <br /> the San Joaquin County Planning Commission on December 5 , 2013 . The effective date of approval <br /> is December 15 , 2013 . This approval will expire on December 31 , 2029 , unless ( 1 ) all Conditions of <br /> Approval have been complied with , (2) all necessary building permits have been secured and remain <br /> in force , and ( 3) all necessary permits from other agencies have been secured and remain in force. <br /> Unless otherwise specified , all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits . Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application . Ordinance requirements cannot be modified , and other Ordinance requirements may <br /> apply. <br /> 1 . COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: John Funderburg , 468- 3160) <br /> a . APPROVAL : This is a Quarry Excavation application to remove approximately 2 . 4 million cubic <br /> yards of rock , sand , and gravel from approximately 71 acres of an 80-acre site over a 26-year <br /> period . The mining will occur in three phases . Phase 1 shall consist of 30 acres to be reclaimed <br /> by 2019 . Phase 2 shall consist of 15 acres to be reclaimed by 2023 . Phase 3 shall consist of 26 <br /> acres to be reclaimed by 2029 , The material that is excavated shall be transported by conveyor <br /> belt underground approximately 0 . 10 miles west on River Road to an existing processing facility . <br /> Reclamation is proposed to be continuous and concurrent with mining . The quarry shall be <br /> replanted in either walnuts or almonds in 15- to 30- acre increments . <br /> b . STOCKPILING : No stockpiled soil or material shall be placed closer than twenty five (25) feet to a <br /> property boundary . (Development Title Section 9- 1415 . 3[ b]) <br /> c. PRIVATE ROADS : All private roads involved in an excavation shall be maintained to control the <br /> creation of dust . The first one hundred ( 100) feet of any private road on the property which intersects <br /> with a publicly maintained road shall be surfaced in a manner approved by the Director. Traffic <br /> control and warning signs shall be installed , if required , at such intersections . The placement and <br /> size of these signs shall be approved by the Director of Public Works . (Development Title Section 9- <br /> 1415 . 3 [c]) <br /> d . EROSION CONTROL : Protective vegetative planting , silt screen dams , or other approved methods <br /> shall be required where necessary for the control of erosion . An erosion and sediment control plan <br /> approved by Development Services Division shall be part of the reclamation plan . (Development Title <br /> Section 9- 1415 . 3 [d]) <br /> e . HOURS OF OPERATION : Excavation operations shall normally be carried on during the hours from <br /> 5 : 00 a . m . to 9 : 00 P . M . (Development Title Section 9- 1415 . 3 [f]) <br /> f. REPLACEMENT OF TOPSOIL % The topsoil shall be set aside , and upon completion of an <br /> excavation , the topsoil shall be replaced and the site leveled in conformance with the excavation <br /> permit . (Development Title Section 9 - 1415 . 3 [g]) <br /> g . WEED CONTROL : If noxious weeds are on the site , operations shall be in accordance with <br /> instructions from the Agriculture Commissioner of San Joaquin County . (Development Title Section <br /> 9- 1415 . 3 [ h]) <br />
The URL can be used to link to this page
Your browser does not support the video tag.