My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008324
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TOM PAINE
>
18775
>
2900 - Site Mitigation Program
>
PR0004367
>
ARCHIVED REPORTS_XR0008324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 4:03:35 PM
Creation date
5/7/2020 3:53:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008324
RECORD_ID
PR0004367
PE
2951
FACILITY_ID
FA0004052
FACILITY_NAME
FARM UGT
STREET_NUMBER
18775
Direction
S
STREET_NAME
TOM PAINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21302030
CURRENT_STATUS
02
SITE_LOCATION
18775 S TOM PAINE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ground level , it is felt that further excavation of the site of <br /> the UST is not a viable option at this time. The water quality <br /> is already highly degraded by salts and other substances, and <br /> breaching the water- table by removing additional spoil may <br /> exacerbate the situation. It is believed that hand--augered <br /> borings offer the best and most cost-effective method of <br /> determining the extend of the contamination. <br /> 1. Using a 4" hand auger, auger to a depth of approximately 10 <br /> feet, or into the capillary fringe or transition zone. Soil <br /> samples are to be collected from the teeth of the auger at 5' & <br /> 10 ' , or total augered depth; the bottom sail sample to be taken <br /> from the transition zone if passible. Auger hole are to be <br /> located approximately as shown on Plate VII . <br /> 2. The soil samples will be collected by the geologist in <br /> properly prepared brass tubes supplied by FOL Environmental , <br /> sealed, labeled and placed on ice pending transfer to the lab for <br /> analysis. The auger will be thoroughly cleaned between each run <br /> by rinsing with TSP and then clean water. Samples will be <br /> transported to the lab under propel~ chain of custody, and <br /> analyzed for bTEK, TPH-G, and soluble lead. <br /> 3. Every effort will be made to avoid penetrating the water <br /> table. <br /> 4. All auger holes will be filled with grout immediately <br /> following final sampling. Removed spoils will be placed in <br /> properly labeled and sealed drums, and stored on site pending <br /> final completion of the project. <br /> A Health and safety plan is attached as Exhibit D. <br /> Further investigative or remedial work will be proposed after <br /> reviewing the results of the laboratory analyzes of the soil <br /> samples. <br /> Your prompt review and response to this workplan will be greatly <br /> appreciated; our client is currently marketing the property for <br /> sale, and wishes to have this matter resolved as quickly as <br /> possible. <br /> ED Gfp�ocs <br /> Yours t r l y, WLLIAM J HINTER � <br /> J. er <br /> . <br /> cc. Elaut Appleton 4r NO 860 <br /> Thorpe Gil T� orC{�t�FQ�� <br /> 3 <br /> (revised) <br />
The URL can be used to link to this page
Your browser does not support the video tag.