Laserfiche WebLink
b Rlnsata Hauler <br /> Name Jim Ihor a Oil Inc. <br /> Address o x 3 N. ileckman R <br /> City Lodip State Ca. Zip 2524)-0.357 _ <br /> Plaotte No (� ) 7 flaiuler Registralldrls # .2667 <br /> C Tank/Piping Hauler <br /> Name Same as above <br /> Address <br /> City State Zip <br /> Phone No ( Ilaultr Registration # <br /> d. Tank PIPAng DJsposa! Site <br /> Narpa c n zer Steel Products <br /> Address 1.2()no_f�l.srxrt_I31 <br /> City Rancho Cordova - - - - State Tip <br /> Phona No (01A -) 5185:hAJn - -- - - - - E$1'A ID # <br /> e Contaminated Soil Hazardous Waste 11auler <br /> Name Dillard Trucking <br /> Address 329 i 13yers fid RL By 71 <br /> City^�$yrQClState --CaZIP 91,514 <br /> f'ltona No (�i i5 )_ b -05h7 Ifauler Reglsirallon ,P <br /> . EVA CAD 981692609 <br /> 9. Describe the molhod for purging andtor inertlag of the maks) <br /> Tank (a) and line (s) will first be triple rinsed and pumped out. 'then An appro- <br /> prlate amount of dry icdp will be added--L!U br'lruc Wic tank l`d)_ill_dr3_inert al-Hf-a-- <br /> Tank (e) will _be moDitopedOtth art LEL ineter, -- <br /> `�_ D ice will be added at a-ratre of 15 lbs. and 30 lbs. /1000 gal cap. for diesel <br /> and gasoline respectively. - - <br /> 10 Iias the applicant provided the detection limits that will be utilized 1tt the suggested analysis? YES M NO <br /> - -- <br /> acePup, f3- - <br /> 11 Describe In delall !row the soil andlas wafer samples beneath the lack's !avert and p1ping will be obialnedl. <br /> After the tank (s) have been reiijoved we will dig dovin approximately to I Lget <br /> ata undisturbed soil urldierAhe nark- (sand-plpisyg-1 ",awplai <br /> will be tae - the-iffi-tutiou «r !'liSlEltll- caps swr it#gra. <br /> Samp1 A ,otoC-ol la outlined ori " Sa[nu l i ng_prot.nci for- Rai l t f nA 'ruik RauQ;,a l" __ t <br /> and " Minti urn ilerirication laboratory Analysis " sttd:et.9 eltciosed. <br /> 12 Describe how the excavation will be backfllled with suitable material (earth, sand!, etc) upon removal <br /> Back fill of excavation_ will tiedlorS�w�tfr-aprir l.a mat.pri al i[rv,n rrynnl At inn <br /> of the ProJect, A det ni l <br /> that time. Back fill mater.141,1 go jj . 1(4 t(i. -graiwl <br /> . Aff <br /> s an accepted material ac race u e reqs res an engineereds <br /> compaction reportl it will be supplied as it is made avalla6le o us by the <br /> eng neer+ ng rm. <br /> Page 5 <br />