Laserfiche WebLink
4 TOWER PARK MARINA <br /> SPILL PREVENTION CONTROL AND COUNTERMEASURE (SPCC) PLAN CHECKLIST <br /> YES NO N/A COMMENTS <br /> 47 Is there an observation schedule for surface discharges of plant x <br /> effluent? <br /> 48 Are there leaks within the diked areas and plane for prompt x Pipe and joint leaks have been detected and addressed. <br /> removal? However,during this inspection I found a joint and valve which <br /> had signs of leakage. <br /> 49 Are there any mobile or portable oil storage tanks without x <br /> containment? <br /> 50 Are inspection procedures and records included in the SPCC x <br /> plan f 112.7(e)(8)1? <br /> 51 Are all essential systems secure 11 12.7(e)(9)1? x <br /> 52 Is there adequate training 11 12.7(e)(9)1? I x <br /> i <br /> i <br /> {r <br />