My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
14900
>
2900 - Site Mitigation Program
>
PR0009023
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:47:37 PM
Creation date
5/7/2020 3:57:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009023
PE
2960
FACILITY_ID
FA0004091
FACILITY_NAME
TOWER PARK MARINA
STREET_NUMBER
14900
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05503015
CURRENT_STATUS
02
SITE_LOCATION
14900 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAW/C"ALL, INC: A geotechnical, environmeM4&construction materials consultants <br /> t e Suite 0 1San Rafael California 94903 Phone 415 499-1422, Fax(415)499-8419 <br /> . 4000 Civic Center Drive, 3 5 ( ) <br /> Los Angeles A Anaheim A 'Marina del Rey A Phoenix A Riverside A San Diego A Seattle <br /> March 4, 1993 MAR 8 1993 <br /> Mr. Philip S. Isorena ENVIRONMENTAL HEALTH <br /> Sanitary Engineering Associate <br /> Central Valley Regional Water Quality Control Board <br /> 3443 Routier Road <br /> Sacramento, CA 95827 <br /> Subject: Schedule'for ReMAKIhIng Workplan Tasks <br /> Tower Park Marina, Lodi, California <br /> Law/Crandall Project No. 2123-20662-1 <br /> Dear Mr. Isorena: <br /> This letter provides a tentative schedule for the remaining tasks described in Law <br /> Envronmental's Revised Tower Park Marina Workplan dated August 7, 1992. <br /> REMAINING TASKS SCHEDULE <br /> 1) Clarification of Technical Conditions 3/1/93 - 3/14/93 <br /> in Reclamation District Permit #548 <br /> 2) Remaining Piping Trench Sampling and Soil 3/15/93 - 3/28/93 <br /> Sampling/Monitoring Well Installation <br /> 3) Interim Remedial Actions (installation of trenches) 3/29/93 - 4/5/93 <br /> 4) Free Product Recovery Evaluation 4/5/93 - ongoing <br /> 5) Laboratory Analysis 3/29/93 - 4/12/93 <br /> 6) Reporting 4/12/93 - 5/10/93 <br /> We_ have_ spoken with Mr. Tom Rosten regarding our technical conditions in the <br /> Reclamation District #548 Permit. We will write a letter confirming Mr. Rosten's � <br /> clarifications by March 14, 1993. The interim remedial actions, if necessary, will be <br /> implemented based on the findings of assessment tasks. If the implementation of the <br /> remedial actions requires more time than scheduled, a revised schedule will be prepared. <br />
The URL can be used to link to this page
Your browser does not support the video tag.