Laserfiche WebLink
." --To br Park Marina } -2- 26 May 1988 <br /> The proposed monitoring well- construction should be revs�d�'or` --� <br /> /clarified--in- :a.-coup-Te -of--areas. First of all the work plan proposes <br /> a screened interval above the existing water table of only 1 to 2. <br /> feet. Five feet is a more appropriate interval to allow for. larger <br /> fluctuations in the water table elevation. : Secondly, the well <br /> construction discussion does not propose any well development once <br /> construction is complete. Each well must be developed prior to the <br /> collection of ground water samples. <br /> C A revised SCWP should',`he subYi tted: This revision should <br /> incorporate the above comments into a work plan that will, upon <br /> completion of the work, identify the source of the contamination, <br /> determine the areal and vertical extent of soil and ground water <br /> pollution, ,and-consider--rr,.medial-action alternatives, if necessary. <br />