Laserfiche WebLink
4. 5.0 CONCLUSIONS AND RECOMMENDATIONS <br /> The following-conclusions and recommendations are presented in this report. <br /> 1) BTEX components were not detected in the June 1994 groundwater samples whereas they <br /> were detected at component concentrations ranging from 0.84 ug/l to 20 ug/l in the June <br /> 1993 sampling event. <br /> { 2) TPH/G has never been detected in the groundwater samples collected at the Site. <br /> hr <br /> 3) TPH/D concentrations decreased in wells MW-2 and MW-4 between June 1993 and June <br /> 1994;however,the TPH/D concentration increased from non-detectable in MW=1 to 1,700 <br /> ug/l, which is considered to be a relatively low level. <br /> 4) Free product has been removed from well MW-3 using a passive recovery device since <br /> May 1994. The amount of free .product removed from the well has been decreasing; <br /> however, it is not clear as to whether this is due to the presence of less free product, a <br /> lower water level,and/or non-optimum depth placement of the recovery device within the <br /> well. The placement of the device in the well will be checked, free product will continue <br /> to be removed at least weekly, and SECOR will review:the free product recovery results <br /> on a monthly basis. <br /> 5) The soil sample analytical results from well MW=3 were inconclusive as to the depth from <br /> which free product is emanating. These results are considered.to be.qualitative since the <br /> samples collected from depths below.5 feet had exceeded their holding times. TPH/D was <br /> detected at 85 mg/kg in the sample collected from a depth of 5 feet and at 64 mg/kg.from <br /> the sample collected from a depth of 15 feet. <br /> 6) Since naturally occurring biodegradation appears to have -.reduced groundwater <br /> concentrations, additional investigation and/or remediation, beyond the removal of free <br /> product from MW-3, is not recommended at this time. The Quarterly Monitoring and <br /> Reporting Program will be implemented upon Regional Board finalization. <br /> CC <br /> l� <br /> G:\SUSAN\TOWERPK\WKPLAN <br /> 50114-001-01 5-1 <br />