Laserfiche WebLink
I <br /> _ .ATTACHMENT A <br /> ( COMMENTS TO DRAFT MONITORING AND REPORTING PROGRAM <br /> TOWER PARK MARINA <br /> LODI, SAN JOAQUIN COUNTY <br /> Page 1, paragraph 1: Revise the last sentence to read: "After construction, new wells(if any)are to be <br /> sampled and analyzed for the constituents below and added to the monitoring <br /> program if constituents are detected in the groundwater sample." <br /> Page 1, paragraph 2: Revise the second sentence to read: "NMs with measurable free-phase petroleum <br /> product shall be corrected.for project thickness to obtain an approximate depth <br /> to ground water." <br /> Page 1, note 1: Revise the first and second sentence to read: "From wells which have not been <br /> monitored for dissolved (filtered) or total lead. If .dissolved or total lead is <br /> detected, the Discharger shall resample the well for dissolved lead during the next <br /> quarterly sampling event." <br /> Page 1, paragraph 3: Insert after the first sentence: "The first calendar quarter shall begin during the <br /> month of _ ". (Insert the month that this program is finalized in the blank <br /> space). <br /> Page 2, paragraph.1: Revise the first sentence to read: "Prior to startup of a ground water treatment <br /> system, if any, the Discharger...." <br /> •i <br /> Page 2, paragraph 2: Revise the paragraph to read: "An annual report evaluating the effectiveness and <br /> . progress of investigation and remediation.(if any) shall be.submitted to the Board <br /> by the 30th day of the month following the fourth consecutive quarterly sampling <br /> event and may be submitted for.the quarterly monitoring report. The report shall <br /> contain the following information, if applicable: tabular summaries of.the <br /> monitoring data obtained during the year; a graphical.summary of the monitoring <br /> data for the key indicator compound(ie., TPH/D or benzene) obtained during the <br /> previous.year if it is consistently detected, groundwater contour maps and <br /> contaminant concentration maps'(if concentration contours can be developed); a <br /> discussion of trends in the concentrations of the pollutants in groundwater <br /> monitoring .wells; whether the contaminant plume is being captured by an <br /> extraction system or is continuing to spread; plans as needed for improving the <br /> groundwater extraction .or treatment system; and the anticipated date for <br /> completion of cleanup 'activities. If applicable, the annual report also shall <br /> +� include the reasons for and durations of all interruptions in the operation of <br /> treatment systems. <br /> i <br /> GASUSAMTOWERMWKPLAN <br /> r50114-001-01 1 of 2 <br /> j <br />