My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TOSTE
>
2353
>
2900 - Site Mitigation Program
>
PR0231735
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 4:24:05 PM
Creation date
5/7/2020 4:07:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0231735
PE
2381
FACILITY_ID
FA0003778
FACILITY_NAME
TRACY MARINE SALES
STREET_NUMBER
2353
STREET_NAME
TOSTE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
2353 TOSTE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Messrs Trommer and L'Mon 30 June 2008 <br /> Preliminary Five-Year Review Letters Page 2 of 5 <br /> Various Sites <br /> justifications for these proposals. The EHD will direct rebound testing with <br /> evaluation of the sustainability of significant vapor concentrations a test objective; <br /> the EHD will also direct a work plan for confirmation borings to evaluate <br /> effectiveness of the previous SVEIIAS operation and identify locations where <br /> additional SVE wells may be beneficial. The EHD will also direct a vapor intrusion <br /> evaluation for the site. <br /> 2315 EI Dorado Street, N. <br /> • The CUF recommended that the EHD direct the RP to continue to operate the <br /> groundwater remediation system and maximize it as necessary to achieve <br /> WQOs in a timely manner. The EHD agrees with this recommendation. Dual <br /> phase extraction has been employed on the site; a letter will be issued to <br /> revaluate the DPE operation and recommend appropriate modifications, if <br /> needed, to maximize contaminant mass recovery. <br /> 6230 Pacific Avenue <br /> • The CUF recommended that the EHD direct the RP to assess an alternative <br /> groundwater treatment technology that will achieve WQOs more rapidly and cost <br /> ,. effectively; the EHD agrees with this recommendation. A meeting was held with <br /> aw the RP in January 2008 to discuss various proposals to maximize the cost <br /> effectiveness of the remediation effort in view of the diminishing CUF monies <br /> available for this site. The proposals presented to the EHD were given as options <br /> with estimated cost and effect on the depletion date of CUF monies; technical <br /> justifications were not provided, nor were any professional recommendations. <br /> The EHD has issued a directive to submit a feasibility study if an appropriate <br /> technology can be employed, with technical and cost effectiveness evaluations. <br /> The EHD also noted the need for additional plume delineation. <br /> 517 Fremont Street, E. <br /> • The CUF recommended that the EHD direct the RP to assess remedial <br /> technologies and implement active remediation to achieve WQOs in a timely <br /> manner. The EHD agrees with this recommendation. Remediation wells have <br /> recently been installed and a pilot test proposed. The EHD will direct prompt <br /> performance of the pilot test. <br /> 420 Yosemite Avenue, W. <br /> • The CUF has recommended that the RP reduce monitoring frequency and that <br /> the EHD direct the RP to add additional remedial technology to achieve WQOs <br /> more rapidly, also the CUF noted that the plume was poorly defined toward the <br /> northwest. The EHD agrees with these recommendations. By letter dated 26 <br /> September 2007, the EHD approved a reduction of sampling frequency for <br /> selected wells and directed differentiation of total petroleum hydrocarbons <br /> quantified as gasoline (TPHg) from tetrachloroethylene (PCE) by EPA Method <br /> 8260B. A GWE system operated from January 2002 to September 2007; a work <br /> plan has been submitted for installation and utilization of two additional GWE <br /> wells; the EHD will review the work plan and comment as appropriate. The EHD <br /> will issue a directive to complete the plume delineation toward the northwest and <br /> has issued a directive to perform a vapor intrusion evaluation. <br /> 5-Year Review Comment Letter 063008.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.