Laserfiche WebLink
Toste Farms, Inc. -2- May 28, 2002 <br /> Claim No. 014558 <br /> COST PRE-APPROVAL BREAKDOWN <br /> # Task* Amount Pre-Approved Comments <br /> 1 Permitting/Pre-Field Activities $673 <br /> 2 Well InstalIation(One extraction $4,509 <br /> well and one observation well <br /> 3 Well Development& SIELej $1,090 <br /> 4 Aquifer Pumping Test(8 hour step $3,165 Waste water disposal costs evaluated <br /> drawdown test) at time of reimbursement based on <br /> actual amounts. <br /> 5 Aquifer Pumping Test(24 hour) $61780 Waste water disposal costs evaluated <br /> at time of reimbursement based on <br /> actual amounts. <br /> 6 Report Preparation(PAR- $4,135 <br /> Including Feasibili Studies <br /> TOTAL PRE-APPROVED $20 52 <br /> * Task descriptions are the same as those identified in Advanced GeoEnvironmentals April 22,2002 cost <br /> estimate. <br /> • Only the tasks/costs reflected on the above table are pre-approved at this time. The Fund will <br /> review any tasks/costs that go beyond the pre-approved amount to be determined if the <br /> additional tasks and costs are necessary and reasonable. However, if costs exceed the above <br /> pre-approved amounts,the Fund will be unable to expedite your Reimbursement Request. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the Advanced GeoEnvironmental proposal in my pre-approval <br /> above, please be aware that you will be entering into a private contract: the State of <br /> California cannot compel you to sign any specific contract. This letter pre-approves the <br /> costs as presented in the proposal dated April 22, 2002 by Advanced GeoEnvironmental for <br /> conducting the work approved by the County for implementing the January 7, 2002, <br /> Advanced GeoEnvironmental workplan. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultant prepares their <br /> invoices to include the required breakdown of costs on a time and materials basis, that <br /> CBMorgla E'nvironmentalProtea on Agency <br /> P.e1 Recyc%d,-,. <br />