Laserfiche WebLink
Case Closure Summary <br /> Leaking underground Fuel Storage Tank Program <br /> III. Release and Site Characterization Information continued <br /> Maximum Documented Contaminant Concentrations--Before and After Cleanup <br /> Contaminant Soil (ppm) Water (ppm) Contaminant Soil (ppm) Water (ppm) <br /> Before After Before After Before After Before After <br /> TPH(Gas) 3,400 NA 44 <0.050 Ethylbenzene 19 NA 1.5 <0.0005 <br /> TPN (Diesel) NA NA NA NA Xylenes 430 NA 5.6 <0.0006 <br /> Benzene 21 NA 5.0 <0.0005 MTBE 770 NA 130 <0.001 <br /> Toluene 320 NA 7.2 <0.0005 1,2-DCA <0.005 NA 0.015 <0.0005 <br /> Lead 8.5 NA NA NA <br /> Comments: The `Soil Before' concentrations for TPH (gas), benzene, toluene, xylenes and MTBE are from sample L1 @ <br /> 2.5 feet on 10131196, ethylbenzene from B4-5 @ 5 feet on 06124198, 1,2-DCA from MW-9 @ 10 feet on 03123101, and lead <br /> from T2N and T2S @ 9 feet on 10/31196. `Soil After' concentrations were not collected. The `Groundwater Before' <br /> concentrations for TPH (gas) are from MW-7 on 12/02/99 and 08128104, benzene and MTBE from MW-7 on 12108100, <br /> toluene, ethylbenzene, and xylenes from MW-7 on 12102199, and 1,2-DCA from MW-7 on 01102/07. The 'Groundwater <br /> After' concentrations for TPH (gas) and MTBE are from MW-7 on 03109111, and benzene, toluene, ethylbenzene, xylenes, <br /> and 1,2-DCA are from MW-7 on 11125108. NA—not analyzed <br /> IV. Closure <br /> Does completed corrective action protect existing beneficial uses per the Regional Board Basin Plan? Yes <br /> Does completed corrective action protect potential beneficial uses per the Regional Board Basin Plan? Yes <br /> Does corrective action protect public health for current land use? Yes <br /> Site management requirements: None <br /> Should corrective action be reviewed if land use changes? Yes <br /> Monitoring/Vapor wells decommissioned: No Number Decommissioned: 0 Number retained: 11 MWs, 1 observation well, <br /> 1 extraction well, and 10 ozonesparge wells <br /> List enforcement actions taken: Notice Of Responsibility on 01/16/98 <br /> List enforcement actions rescinded: None <br /> V. Local A ency Representative Data <br /> Name: Adrienne Ellsaesser, REHS Title: Acting Program Coordinator <br /> Signature: �� / jam Date: <br /> VI Central Valley Regional Water Quality Control Board RB Notification <br /> Date Submitted to RB: Response Date: <br /> RB Staff: James L.L. Barton Response: <br /> Title: Associate Engineering Geolo ist <br /> VII. Additional Comments, Data, etc. <br /> Ozone injection totaled 24,255 hours between 01 .tune 2004 and 14 July 2009. <br /> This document and the related CASE CLOSURE LETTER shall be retained by the lead agency as part of the official site file. <br /> Page 2 <br />