My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TOSTE
>
2353
>
2900 - Site Mitigation Program
>
PR0231735
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 4:24:05 PM
Creation date
5/7/2020 4:07:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0231735
PE
2381
FACILITY_ID
FA0003778
FACILITY_NAME
TRACY MARINE SALES
STREET_NUMBER
2353
STREET_NAME
TOSTE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
2353 TOSTE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> San Joaquin County <br /> Environmen#al Health Department o• e DIRECTOR <br /> t, G Donna Heron, REHS <br /> -'� 600 East Main Street <br /> Stockton California 95202-3029 PROGRAM COORDINATORS <br /> •� u' ' Robert McClellon,REHS <br /> ~ ;.. Jeff Carruesco,REHS,RDI <br /> WeKasev v,REHS Foley, <br /> Website: <br /> _n Phone: (209) 468-3420 Linda Turkalte, RCHS <br /> Fax: (209) 464-0138 <br /> December 15, 2011 <br /> Mr. Robert Trommer, CHG <br /> Chief Technical Review Unit <br /> State Water Resources Control Board <br /> PO Box 944212 <br /> Sacramento, CA 94244-2120 <br /> SUBJECT: COMMENTS ON CLEANUP FUND SITE CLOSURE RECOMMENDATIONS <br /> Dear Mr. Trommer: <br /> On 23 November 2011, the San Joaquin County Environmental Health Department (EHD) <br /> received your email requesting comments on the closure status of 31 sites in the EHD Local <br /> Oversight Program (LOP) for which your office, the State Water Resources Control Board <br /> Cleanup Fund (CUF), has made closure consideration recommendations. Two lists were <br /> submitted to the EHD, one with 11 sites that had been previously taken to the Director-level of <br /> the LOP, and a list of 22 sites being taken to the Director level for the first time. One site on the <br /> latter list also appears on the former list (1876 Country Club Blvd., Stockton, CUF Claim No. <br /> 1026), and a second site on the latter list (CUF Claim No. 16908) is not in San Joaquin County, <br /> leaving 20 new sites to be commented on. Of the 31 total sites: <br /> • Fifteen are in the final closure process, meaning a decision to close the site has been <br /> made and site closure is awaiting preparation of various documents by the EHD, <br /> completion of the notification process, destruction of monitoring wells, and/or submission <br /> of certificates of disposal of investigation-derived wastes (IDW). <br /> • Five are in the closure process, meaning a closure decision is probable, but has not yet <br /> been made pending review of submitted documents; and <br /> Eleven sites need to have reports submitted to address various issues related to making <br /> a closure decision on the site, such as Human Health Risk Assessments, vapor intrusion <br /> evaluations, etc. <br /> The individual case statuses, starting with the previously submitted request list are as follows: <br /> CUF Claire No. 889 (former Moore Petroleum, 5491 F Street, Banta) — in Final Closure <br /> Process. The case closure summary (CCS) is in preparation and will be submitted to the <br /> Central Valley Regional Water Quality Control Board (CVRWQCB) as part of the 30--day <br /> notification requirement; monitoring wells need to be destroyed; and the certificates for IDW <br /> disposal must be received <br /> CUF Claim No. 1026 (former Sanchez Property, 1876 Country Club Boulevard, Stockton) — <br /> in Final Closure Process The CCS is in preparation and will be submitted to the <br /> CVRWQCB as part of the 30-day notification requirernent,- monitoring wells need to be <br /> destroyed; and the certificates for IDW disposal must be received. This site was on both <br /> submitted lists for comments, but is only commented on here. <br />
The URL can be used to link to this page
Your browser does not support the video tag.