Laserfiche WebLink
Mr. Robert Trbmfner. Page 4,0 <br /> f 5 <br /> Comrrient's,on CUF Site Glosure RecommOd'ations Decei'nbet 1:5, 2GII1 <br /> notifications of impending ,site. closure: Monitoring wells must still be d6:Wyed and <br /> Certificates of disposal:of IDW must be'received prior to issuance of;a closure letter. <br /> CUF Claim 'No. 8109 (Cherokee Trucking; 3535 :Cherokee Road, Stockton) — Report <br /> Needed. The EHD has directed. preparation of a no-further-action-request report and will <br /> review it when' it has been 'submitted. If the report's favorable and adequate, the EHD will <br /> initiate the closure process. Monitoring wells must still be destroyed and certificates of <br /> l disposal of IDW.must be received prior to.-issuance of a closure letter. <br /> CUF Claim No. 10841 (former Den's Auto, 308•S: 'EI Dorado Street, Stockton) — Report <br /> ! Needed. In view of the CUF closure recommendation, the EHD has directed preparation <br /> and submittal of a hurrnan health risk-assessment, a vapor intrusion evaluation, water well <br /> sampling, an estimate of the time required to achieve water quality objectives (VVQas), and <br /> a reduction of monitoring'well.sampling. Tke report of findings should be submitted in ars <br /> NFAR report, if appropriate. The EHD.will carefully review the'report and initiate the closure <br /> process as warranted. <br /> f <br /> F <br /> CUF Claim No. 12228 (forrrrer Curtiss Pontiac, 2450 Toste Road, Tracy) — Report Needed. <br /> I An .NFAR report is in preparation. Upon receipt. and -review of the report, if favorable and <br /> j adequate., the EHD will initlatoIhe closure process. <br /> i <br /> CUF Claim No. 12858 (Five-Star -Marina,. 3.45 W, Yosemite Avenue, Stockton) -'in Final <br /> Closure Process. The. notification. of pending site closure has beers issued to the <br /> j CVRWQCB: Upon completing of the notification period, the monitoring wells must be <br /> j destroyed and certificates of disposal for the ibW must be submitted to .the EHD so the <br /> closure. letter can be issued. <br /> CUF Claim No. 13578 (Flame Liquor, 1"301 W. Kettleman.Lane, Lod) — in Final Closure <br /> Process. Permits have been issued for the monitoring well destructions. Certificates of <br /> disposal for the.1DW will be needed prior to.'issuing the closure letter. <br /> CUF Claim No. 13729 (former Thrifty Oil, 1250 N. Wilson Way, Stockton) = in Final <br /> Closure Process, The 30-day closure: notification. has been .sent to the: CV.RW.QCB'. <br /> i Monitoring wells must:still be destroyed and certificates:of disposal of I DVV rrtus4 be received <br /> by the-EHD prior to issuing the closure letter: <br /> CUF Claim No. 13849 (super Stop Mart, 290 Main Street., Manteca) -- in Final Closure <br /> Process. The 30=day closure'notifieation:has;been sent to the CVRWQCB. Mo <br /> r3itorng wells <br /> must still be destroyed and certificates of disposal of'IDW must be received priorto issuance <br /> rof a.closure letter, <br /> CUF Claim No. 14167 (Navarra Property, 75Q0 W. Eleventh Street, Tracy) — Report <br /> Needed. The EHD directed preparation Of.an NFAR that pulled together all current data to ! <br /> assure 'that all issues have been addressed. The consultant is declining to� prepare the <br /> report, indicating that the information has already. been presented 'in various reports, The <br /> EHD will pull the information together:as`tiMe permits- <br /> CUF Claim No. 15783 (AMIPM, 3250 VT Hammier Lane, Stockton) — Report Needed. By <br /> letter dated 25 May 2011, the EHD had responded to the draft annual five-year review letter <br /> dated 18 April 2011, in which the CUF recommended consideration of site closure after <br /> pushing for groundwater remediation the previous three years. An ozone injection system <br /> was ready to go online at that time, so the EHD requested that the Five-Year Review <br /> committee reconsider the closure recommendation pending the results of at least the ozone <br /> injection pilot test. The Five-Year Review coram ttee did riot respond directly to.the 'EHD, but <br /> had apparently decided to continue. with site closure as evidenced by the unmodified 18 <br /> April 2011 letter being uploaded to GeoTracker on 20 June 2011. As the CUF Five-Year <br /> Review committee has decided the site should be closed, the FHD will direct'preparation of <br /> an NFAR that includes the results .of the ozone injection pilot test. <br />