Laserfiche WebLink
CHILLER INSPECTION <br /> Suction Press p <br /> Chiller Liquid Level (5-60 PST) Temp In Tem Out <br /> 2AB % Z 0 <br /> 43AB % �' ) <br /> -711 <br /> BB 11E <br /> g % 5 2L <br /> 9 <br /> 10 % � <br /> 11 " % <br /> -, <br /> 12 L j <br /> 13 "IQUID <br /> 14 <br /> SUCTION ACCUMULATOR/ G SSURE RECEIVER <br /> TRANSFER CHECKLIS <br /> Accumulator NH3 Level ) " Liquid NH3 Bulls ( ) <br /> An Oil Drained Approx. Gal <br /> Trans. Pump/Check Oil •� � ' Y <br /> 0 � Visual Condition d< <br /> Transfer Pump Run Time <br /> __- -— Inspections of P.R.V.'s And <br /> Any Oil Drained Approx. Gal Values jk <br /> EMERGENCY AMMONIA DIFFUSION AMMONIA RECIRCULATOR <br /> PANEL PACKAGE <br /> Check Cornell Pump for On Pff <br /> Visual Inspection of Panel Proper Operation <br /> Suct: ° r L Check Oil Reservoir g Indicator <br /> Are Gauges in Proper Operation (5-60 psi) ?"t Rod Z <br /> Condition Disc: Check Shaft Seals and Any <br /> (120-205 psi) �l Indications of OR Leaks <br /> Any Indications of Ammonia Leaks in Surge Drum level Bulls ( 1 ) <br /> Panel <br /> Check Pressure Gauges <br /> Any Oil Drained Approx. <br /> Gal <br />