Laserfiche WebLink
December 22, 1995 <br /> Wright Project No. 4123-S <br /> Site Qosure Report <br /> 1 <br /> TABLE 1: SOIL SAMPLE DESCRIPTIONS <br /> EXCAVATION SAMPLES <br /> A B C D <br /> 1 Sample Number Date Sampled (1995) Depth Interval Description <br /> 2 (feet below grade) <br /> 3 <br /> 4 ESW-1 August 25 10.5 - 11.0 Eastern Sidewall <br /> 5 ESW-2 August 25 10.5 - 11.0 Northern Sidewall <br /> 6 ESW-3 August 25 10.5- 11.0 Western Sidewall <br /> 7 ESW-4 August 25 10.5 - 11.0 Southern Sidewall <br /> 8 ESW-5 August 25 9,0 - 9.5 Southem Sidewall <br /> 9 EBS-1 August 25 13.0 - 13.5 Bottom of Excavation <br /> 10 <br /> i <br /> TABLE 2: SOIL SAMPLE DESCRIPTIONS <br /> STOCKPILE SAMPLES <br /> A B C D <br /> 1 Sample Number Date Sampled Depth Interval Description ; <br /> 2 (1995) (feet below top of stockpile) <br /> 3 <br /> 4 Composite Sample .A August 25 1.0- 1.5 Stockpile sample <br /> 5 (COrTSP-1,COTSP-3, <br /> 6 COrTSP--5,and 00TSP-7) - <br /> 7 Composite Sample B August 25 2-5-3.0 Stockpile sample <br /> 8 (COTSP-2,COTSPA <br /> 9 COTSP-6,and COTSP-8) <br /> 10 <br /> 10 <br />