Laserfiche WebLink
December 22,1995 <br /> Wright Project No. 4123-S <br /> Site Closure Report <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION 3 <br /> 2.0 SITE DESCRIPTION 3 <br /> 3.0 BACKGROUND 3 <br /> 4.0 SCOPE OF SERVICES 4 <br /> 5.0 PREFIELD ACTIVITIES 4 <br /> 5.1 Surface Reconnaissance 4 <br /> 5.2 Magnetometer Survey 4 <br /> 6.0 FIELD ACTIVITIES - SOIL EXCAVATION, STOCKPILING, 5 <br /> AND SAMPLING <br /> 6.1 Exploratory Test Pits 5 <br /> 6.2 Excavation and Stockpiling of Contaminated Soils 5 <br /> 6.3 Confirmatory Soil Sampling-Excavation Area S <br /> 6.4 Confirmatory Soil Sampling- Stockpile 5 <br /> 6.5 Laboratory Analysis-Soil 6 <br /> 6.6 Summary of Analytical Results 7 <br /> 7.0 FIELD ACTIVITIES - GROUNDWATER REMOVAL 7 <br /> AND SAMPLING <br /> 7.1 Groundwater Removal and Sampling 7 <br /> 7.2 Laboratory Analysis-Groundwater 8 <br /> 7.3 Summary of Analytical Results 8 <br /> 8.0 REMOVAL AND DISPOSAL OF CONTAMINATED SOILS 8 <br /> 9.0 CONCLUSIONS 8 <br /> 10.0 REPORTING REQUIREMENTS 8 <br /> 11.0 LIMITATIONS 9 <br /> Table of Contents Continued on Following Page. <br /> 1 <br />