Laserfiche WebLink
,•� State Nater Resources Contro'Moard <br /> ��- Division of Financial Assistance <br /> 1001 1 Street•Sacramento,California 95814 <br /> Linda S.Adams P.O.Box 944212•Sacramento,California•94244-2120 <br /> (916)341-5787. FAX(916)341-5806. www.waterboards.cagov/cwphome/ustcf Arnold Schwarzenegger <br /> Secretaryfor Governor <br /> Environmental Protection <br /> June 12, 2009 <br /> Andy Zarakani <br /> DIK Tracy Enterprises <br /> 837 Shaw Road <br /> Stockton, CA 95215 <br /> PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 12992, PRE —APPROVAL <br /> REQUEST NO. 7 SITE ADDRESS: 14749 THORTON ROAD N, LODI, CA 95242. <br /> 1 have reviewed your request, received on June 2, 2009, for pre-approval of costs for <br /> installation of Soil Vapor Extraction (SVE) and In-Situ Air Sparge (IAS) wells as well as design, <br /> operation and maintenance of SVE/IAS remediation system. The requested amount of <br /> $117,600 is approved as indicated in table below. <br /> Be aware that this pre-approval does not constitute a decision on reimbursement. However, <br /> necessary (as determined by the Fund) corrective action costs for action work directed and <br /> approved by the Regional Board or the County will be eligible for reimbursement at costs <br /> consistent with those pre-approved in this letter. Also, please note that depending on what <br /> happens in the field, some costs may not actually be necessary. If the Fund agrees that they <br /> were in fact necessary, the Fund will reimburse at reasonable rates (rates consistent with <br /> those pre-approved). <br /> All costs for corrective action must meet the requirements of Article 11, Chapter 16, <br /> Underground Storage Tank Regulations in order to be eligible for reimbursement. <br /> COST PRE-APPROVAL BREAKDOWN <br /> # Amount <br /> Task* Pre- Comments <br /> Approved <br /> 1 Planning, Coordination and $2,770 Install 3 SVE and 16 IAS Wells <br /> Permitting <br /> 2 Piping, Well Boxes, Pressure $18,580 2200' piping and 10 Well Boxes <br /> & Air Regulator Installation <br /> 3Excavation, Demolition, Resurface, <br /> Construction $96,250 Equipment Rental and Traffic Control <br /> $117,600 <br /> California Environmenta/Protection Agency <br /> 1Z o' Recyc/ed Paper <br />