My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14749
>
2900 - Site Mitigation Program
>
PR0507155
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 9:56:29 AM
Creation date
5/8/2020 9:44:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0507155
PE
2950
FACILITY_ID
FA0007718
FACILITY_NAME
3 B'S TRUCK PLAZA
STREET_NUMBER
14749
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05515026
CURRENT_STATUS
02
SITE_LOCATION
14749 N THORNTON RD
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH DEPARTMENT <br /> OPOUIN <br /> Donna K.Heran,R.E.H.S. SAN JOAQUIN COUNTY <br /> er SuperviDirector <br /> Director 304 East Weber Avenue, Third Floor carrl Bergman,R.E.H.S. <br /> AI Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> Program Manager Douglas W. Wilson,R.E.H.S. <br /> o R� Laurie A.Cotulla,R.E.H.S. Telephone: (209) 468-3420 <br /> Program Manager Margaret Lagorio,R.E.H.S. <br /> Fax: (209) 464-0138 Robert McClellou,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> D I K TRACY ENTERPRISES <br /> ANDY ZAP-AYANI <br /> OA FILE COPY <br /> 27451 FAIR OAKS RD <br /> TRACY CA 95304 <br /> RE: Three B's Truck Plaza Fund Claim#: 12992 <br /> 14749 N. Thornton Rd. RO#:000550 <br /> Lodi, CA., 95242 <br /> WORK PLAN: "Work Plan Addendum-July 2002" DATED: July 23, 2002 <br /> PREPARED BY: Advanced GeoEnvironmental Consultants - Tim Cuellar. <br /> STATUS: APPROVED <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S <br /> 25299.37 subd(c)(3p <br /> • Install six (6) 1.7-inch diameter polyethylene (outer) tubing, multi- <br /> chambered, monitoring wells to 150 feet bgs and, <br /> • Collect soil samples for vertical delineation in areas of concern and, <br /> • Analyze selected soil samples for TPH-g & d, Methanol and Ethanol <br /> (8015m), BTEX and 1,2-DCA, EDB„ MtBE, DIPE, ETBE, TAME, and TBA <br /> (8260), Lead (7421), and, <br /> • Develop, survey, and add new monitoring wells to existing quarterly <br /> monitoring requirement and, <br /> • Analyze selected soil samples for microbial enumeration, <br /> physicochemical characteristics, intrinsic permeability, moisture <br /> content, porosity, and total organic carbon and, <br /> • Submit a report of findings to EHD. <br /> COMMENTS AND CONDITIONS: <br /> • Submit EHD well permit application and $89 fee. <br /> REASONS FOR DISAPPROVAL OF THE WORK PLAN rH&S 25299 37 <br /> subd(c)(3)1: <br /> • none. <br /> DATED: August 2, 2002 BY: /vylo <br /> ichael Infurna, enior REHS (209) 468-3454 <br /> [ X ) Faxed to consultant: 8-2-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.