My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14749
>
2900 - Site Mitigation Program
>
PR0507155
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 9:56:29 AM
Creation date
5/8/2020 9:44:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0507155
PE
2950
FACILITY_ID
FA0007718
FACILITY_NAME
3 B'S TRUCK PLAZA
STREET_NUMBER
14749
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05515026
CURRENT_STATUS
02
SITE_LOCATION
14749 N THORNTON RD
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced <br /> GeoEnvironmental, Inc. <br /> 02 May 2001 <br /> AGE-NC Project No. 96-0249 <br /> Mr. Mike Infurna <br /> San Joaquin County PHS-EHD <br /> 304 East Weber Avenue, 3rd Floor <br /> Stockton, CA 95202 <br /> Subject: Work Plan Addendum-April 2001 <br /> THREE B'S TRUCK PLAZA <br /> 14749 Thornton Road,Lodi,California <br /> Dear Mr. Infurna: <br /> At the request of Mr. Andy Zarakani of Three B's Truck Plaza,Advanced GeoEnvironmental, Inc. <br /> (AGE)has prepared the enclosed cone penetrometer testing (CPT)work Plan addendum for 14749 <br /> Thornton Road, Stockton, California. The enclosed work plan is being prepared as an addendum to <br /> Monitoring Well Installation Work Plan, dated 28 August 2000 as required by the San Joaquin <br /> County Public Health Services - Environmental Health Division (PHS-EHD) by letter dated 14 <br /> January 1999 for installation of five ground water monitoring wells and three CPT soil borings. This <br /> work plan addendum presents the proposed scope of work for the advancement of six additional CPT <br /> soil borings at the site <br /> Upon PHS-EHD approval of the work plan addendum, AGE will submit any additional <br /> documentation required for permitting purposes. If you have any questions or require further <br /> information, please contact the undersigned at(209)467-1006. <br /> Sincerely, <br /> Advanced GeoEnvironmental, Inc. <br /> Timothy J u ar <br /> Project Geologist <br /> Enclosure <br /> cc: Mr. Andy Zarakani - DIK Tracy Enterprises Inc. <br /> 837 Shaw Road,Stockton,California 95215 <br /> Telephone(209)467-1006 FAX(209) 467-1118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.