Laserfiche WebLink
1 <br />' 12 February 2003 <br /> • AGE-NC Project No 97-0249 <br />' Page 5 of 5 <br />' 5.0. RECOMMENDATIONS <br /> Based upon data collected during December 2002, AGE recommends <br /> 1 Continued quarterly ground water monitoring at wells MW-1 through MW-6, the next <br /> quarterly ground water monitoring event is tentatively scheduled for March 2003 <br />' 2 Continued coordination of quarterly ground water monitoring events with Flag City Chevron <br />' A Work Plan Addendum was approved by the SJCEHD on 02 August 2002, the scope of work <br /> included installation of six multi-level groundwater monitoring wells at the site AGE has scheduled <br /> completion of these wells for January and February 2003, a report of findings detailing the well <br />' installations will be submitted in Quarterly Report- First Quarter 2003 <br /> 10 6.0. LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the geologic/hydro- <br /> geologic conditions at the site for the purpose of this investigation are made from a limited number <br /> of available data points(e g ground water samples), and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> interpretations, opinions and recommendations contained in this report <br /> r <br /> r <br /> i <br /> • <br /> Advanced GeaEnvirvnmental,Inc <br />