Laserfiche WebLink
I <br />' 13 November 2002 <br /> . AGE-NC Project No 97-0249 <br />' Page 5 of 5 <br />' 2 Continued coordination of quarterly ground water monitoring events with Flag City Chevron <br /> A Work Plan Addendum was approved by the SJCEHD on 02 August 2002, the scope of work <br />' included installation of six multi-levelground water monitoring wells at the site On 30 September <br /> 2002,AGE requested cost pre-approval for the above work plan addendum from the UST Clean-up <br /> Fund Upon pre-approval by the UST Cleanup Fund, AGE will schedule field work with the <br /> ISJCEHD <br /> 6.0. LIMITATIONS <br /> I Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the geologic/hydro- <br /> geologic conditions at the site for the purpose of this investigation are made from a limited number <br /> of available data points(e g ground water samples),and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> interpretations,opinions and recommendations contained in this report <br /> I <br /> I <br /> • <br /> Advanced GeoEnvironmental,Inc <br />