Quarterly Report - Third Quarter 2003 <br /> THREE B'S TRUCK PLAZA <br />' 14749 Thornton Road, Lodi, California <br /> 1.0• INTRODUCTION AND SCOPE OF WORK <br /> Advanced GeoEnvironmental, Inc (AGE) has prepared this quarterly report for 14749 Thornton <br />' Road (the site), Lodi, California The site setting is illustrated on Figure 1 Site structures and <br /> monitoring well locations are depicted on Figure 2 <br />' The objective of the work was to monitor dissolved petroleum hydrocarbon concentrations in ground <br /> water and to characterize ground water flow direction and gradient on the site This report has been <br /> prepared in accordance with guidelines issued by the California Regional Water Quality Control <br /> Board - Central Valley Region (CRWQCB-CVR) for investigation of underground storage tank <br /> (UST)sites A summary of previous investigations at the site was included in Work Plan Addendum <br /> -July 2002, dated 23 July 2002, prepared by AGE, ground water monitoring data acquired to date <br />' is included in the tables of this report <br /> Previous soil characteristics data obtained by a CPT investigation enabled AGE to define six <br />' informal hydrologic units (CPT Site Investigation -Fourth Quarter 2001, dated 15 March 2002) <br /> The informal hydrogeologic units were defined as Hydrologic Unit 1 (10-35 feet bsg), Hydrologic <br /> Unit 2 (35-60 feet bsg), Hydrologic Unit 3 (60-90 feet bsg), Hydrologic Unit 4 (90-110 feet bsg), <br /> Hydrologic Unit 5 (110 to 130 feet) and Hydrologic Unit 6 (130 to at least 150 feet bsg) <br /> The following is a brief summary of second quarter site assessment activities performed at the site <br /> • 15 September 2003 - Depth to water measurements collected at wells MW-1 through <br /> p g <br /> MW-12, ground water monitoring performed at wells MW-3, MW-7 (A-E) and MW-8 <br />' (A-F), <br /> • 16 September 2003 - Ground water monitoring performed at wells MW-2, MW-4, MW-5, <br />' MW-6, MW-9 (A-E), MW-10 (A-F) and domestic drinking water well DW-1, <br /> • 17 September 2003-Ground water monitoring performed at wells MW-1,MW-11 (A-F)and <br />' MW-12 (A-F) <br />' 2.0. MONITORING AND SAMPLING PROCEDURES <br /> On 15, 16 and 17 September 2003, ground water monitoring was performed at the site on ground <br />' water monitoring wells MW-i through MW-12 and domestic water well (DW-1), monitoring well <br /> construction details are summarized in Table 1 Ground water monitoring procedures were outlined <br /> in Work Plan Addendum - October 1998, dated 14 October 1998, prepared by AGE and approved <br /> by the San Joaquin County Environmental Health Department (SJCEHD) by letter dated 21 <br /> December 1998 <br /> r <br /> Advanced GeoEnvironmental,Inc <br /> I <br />