Laserfiche WebLink
PgUIIV ' � <br /> 'oma c COUNTY OF SAN JOAQUIN <br /> 2' '•,Z EUGENE DELUCCHI <br /> y' DEPARTMENT OF PUBLIC WORKS CHIEF DEPUTY DIRECTOR <br /> •'- <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE THOMAS R.FLINN <br /> == STOCKTO N.CALIFORNIA 95201 DEPUTY DIRECTOR <br /> C`'•. ;Q (209)468-3000 MANUEL LOPEZ <br /> q6 F O•R� FAX(209)468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA RICHARD C.PAYNE <br /> DIRECTOR DEPUTY DIRECTOR <br /> February 2, 1993 <br /> M E M 0 R A—N D U M <br /> — - - — — - - - FEB .r.� <br /> 3 1993 <br /> TO: Thomas M. Gau, Senior Civil Engineer C���If <br /> Community Development Department /TYU�it!ur,r)�.. <br /> CONTACT PERSON: Loree Goold Pl,q�yNING <br /> FROM: Charles Kelley, Senior Civil Engine <br /> �fe <br /> Public Services Division <br /> SUBJECT: SA-92-75 to establish a plumbing and electrical supply <br /> store within an existing building. Located on the SW. corner of <br /> Forest Lake Rd. and N. 99 Frontage Rd. (west) , Acampo. <br /> APPLICANT: Arthur Harrison APN: 005-141-26 <br /> INFORMATION: <br /> The site is not located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area. <br /> Forest Lake Road has an existing right-of-way width of 40 feet, and <br /> a planned right-of-way width of 50 feet. <br /> North 99 Frontage Road (west) has an existing right-of-way width of <br /> 46 feet, and a planned .right-of-way width of 50 feet. <br /> RECOMMENDATIONS: <br /> 1. Dedication to result in a 25-foot wide right-of-way from the <br /> centerline of Forest Lake Road to the property line with a 20' <br /> X 20' corner cut-off (snipe) at the intersection with North 99 <br /> Frontage Road (west) shall be required across the frontage of <br /> APN: 005-141-26. (Development Title Section 9-1150. 2) <br /> 2 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of <br /> building permit application. (The fee currently is $5, 713 . 00 <br /> per 1, 000 gross square foot of building as Retail Service" in <br /> the Lodi area. The fee shall be automatically adjusted July 1 <br /> of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. ) <br /> (Resolution R-90-304 , R-91-1025) <br /> 1 <br />