Laserfiche WebLink
' 16 December 2004 <br /> S AGE-NC Project No 97-0249 <br />' Page 8 of 8 <br />' • Additional ground water momtoring wells are warranted in the area northeast of Three B's <br /> Truck Plaza well MW-3, south-southeast of Three B's Truck Plaza well MW-6 and <br /> southwest of MW-16117118, Installation of the additional ground water monitoring wells <br />' should aid in the preparation of a site conceptual model A monitoring well Installation work <br /> plan will be submitted to the SJCEHD prior to 31 December 2004, and <br /> • The higher concentrations off-site at Flag City Chevron well MW-19 represent an additional <br />' release and source of dissolved MTBE and should be assessed <br />' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br />' conditions at the site for the purpose of this investigation are made from a limited number of <br /> available data points(ground water samples), and subsurface conditions may vary away from these <br /> . data points No other warranty, expressed or implied, is made as to the professional interpretations, <br /> opinions and recommendations contained in this report <br /> 1 <br /> 1 <br />' Advanced GeoEnvi ron mental,Inc <br />