Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> AIR POLLUTION CONTROL DISTRICT <br /> n. :Z <br /> N: J., <br /> JOGI KHANNA, M.D., M.P.H. <br /> Air Pollution Control Officer <br /> P. O. Boa 2009 (2321 W. Washington St., Suite I) Stockton, CA 95201 <br /> 209/468-3470 <br /> May 22, 1992 <br /> lig x, r <br /> Steven St. Sure if1N 31992 <br /> Associate Planner (;0iWtVJUJVI7 y r ' <br /> San Joaquin County ��� J ' `�;; _ <br /> Community Development Department IVPJ,Nr�i'✓�";-ia- <br /> Planning Division sr�+� <br /> 1810 East Hazelton Avenue <br /> Stockton, CA 95205 <br /> SUBJECT: SA-92-33 PRE-APPLICATION FOR A SITE APPROVAL TO ADD A <br /> PALLET REPAIR SHOP TO AN EXISTING TRUCK SHOP <br /> The San Joaquin Valley Unified Air Pollution Control District has <br /> reviewed the document file no. SA-92-33 . <br /> The District has the following comments and recommendations: <br /> 1. San Joaquin County's air quality relative to National and State <br /> Ambient Air Quality Standards has been designated as a <br /> non-attainment area by the California Air Resources Board as <br /> follows: <br /> PM-10 - Non-attainment <br /> CO - Non-attainment (for Stockton Metropolitan <br /> Statistical Area only) <br /> Ozone - Non-attainment (possible SIP call area) <br /> The California Clean Air Act, AB 2595, requires counties which are <br /> designated non-attainment to achieve a 5% annual reduction in <br /> emissions until the standards are met. <br /> 2. Emissions generated during the construction/grading are of <br /> concern to the District. The applicant shall implement the <br /> District's fugitive dust control practices if and when construction <br /> and/or grading takes place. <br /> 3 . Projects shall maintain adequate record keeping of mitigation <br /> measures, if applicable for the Air Pollution Control District <br /> staff in making scheduled or unscheduled inspections. <br /> 4 . It shall be a condition of approval for the applicant to notify <br /> the District in writing with respect to the actual date of <br /> construction/grading one week prior to said activities. <br />