Laserfiche WebLink
WATER <br /> Mitigation Measure No. 12 : The existing well on the east side of <br /> the project site should be tested to determine its ability to <br /> reliably pump at least 15 gallons per minute and to provide water <br /> in compliance with state and federal drinking water requirements . <br /> Any new well developed for the project should be tested to deter- <br /> mine its ability to pump at least 15 gallons per minute and to <br /> provide water in compliance with state and federal drinking water <br /> requirements . <br /> Monitoring Agency: San Joaquin County Department of Public <br /> Health Services , Environmental Health <br /> Division. <br /> Monitoring Schedule : Approval of water system by Environment- <br /> al Health prior to final approval of <br /> Improvement Plans . <br /> Agency Responsible for <br /> Ensuring Compliance : San Joaquin County Environmental Health <br /> Division. <br /> Reporting Requirements : Verification of improvements by Environ- <br /> mental Health. <br /> Mitigation Measure No . 13 : Plumbing fixtures (shower heads , <br /> faucets , and flush toilets ) in the proposed project should have <br /> water-conserving features in accordance with state standards . <br /> Monitoring Agency: San Joaquin County Building Inspection <br /> Division. <br /> Monitoring Schedule : To be indicated on building plans . <br /> Agency Responsible for <br /> Ensuring Compliance : San Joaquin County Building Inspection <br /> Division. <br /> Reporting Requirements : Verified on-site during building inspec- <br /> tions . <br /> Mitigation Measure No. 14 : Nitrogen fertilizers should not be <br /> applied within 15-20 feet of the edge of any lake or other body <br /> of water in the project . <br /> 6 <br />