Laserfiche WebLink
Monitoring Schedule : Indicate flood-proofing measures on <br /> project Improvement Plans and building <br /> plans . <br /> Agency Responsible for <br /> Insuring Compliance : Flood Control Division and Building <br /> Inspection Division. <br /> Reporting Requirements : Upon approval of plans and during on- <br /> site inspections . <br /> MITIGATION MEASURE NO. 23 : Drainage collection and detention <br /> facilities should be designed based on drainage criteria present- <br /> ed in the County drainage manual . <br /> Monitoring Agency: San Joaquin County Department of Public <br /> Works , Flood Control Division. <br /> Monitoring Schedule: Include drainage collection and deten- <br /> tion facilities as part of project <br /> Improvement Plans . <br /> Agency Responsible for <br /> Insuring Compliance : San Joaquin County Flood Control Divi- <br /> sion. <br /> Reporting Requirements : Approve as part of Improvement Plans and <br /> verify on-site during construction. <br /> TOPOGRAPHY, SOILS AND GEOLOGY <br /> MITIGATION MEASURE NO . 24 : The existing soils and geologic <br /> conditions should be addressed through standard engineering <br /> practices and the development approval processes of the County <br /> and other agencies . <br /> Monitoring Agency: San Joaquin County Department of Public <br /> Works . <br /> Monitoring Schedule: Submittal of site Improvement Plans <br /> following final site plan review and <br /> Zone Reclassification approval . <br /> Agency Responsible for <br /> Insuring Compliance: San Joaquin County Department of Public <br /> Works . <br /> 10 <br />