Laserfiche WebLink
MITIGATION MEASURE NO . 35 : Water trucks , sprinklers and/or <br /> approved chemicals should be used as often as necessary to con- <br /> trol dust . <br /> Monitoring Agency: San Joaquin County Air Pollution Control <br /> District . <br /> Monitoring Schedule : Submit dust suppression plan prior to <br /> issuance of Authority to Construct <br /> permit . <br /> Agency Responsible for <br /> Insuring Compliance : Air Pollution Control District . <br /> Reporting Requirements : Upon approval of permit and periodic <br /> on-site inspections . <br /> MITIGATION MEASURE NO . 36 : All vehicles leaving the worksite <br /> should be cleaned in order to prevent dirt and mud from reaching <br /> adjacent streets . <br /> Monitoring Agency: San Joaquin County Air Pollution Control <br /> District . <br /> Monitoring Schedule : Include with dust suppression plan. <br /> Agency Responsible for <br /> Insuring Compliance : San Joaquin County Air Pollution Control <br /> District . <br /> Reporting Requirements : On-site inspections during construction. <br /> MITIGATION MEASURE NO . 37 : All trucks should be covered. <br /> Monitoring Agency : California Highway Patrol . <br /> Monitoring Schedule : In compliance with State law. <br /> Agency Responsible for <br /> Insuring Compliance : California Highway Patrol . <br /> Reporting Requirements : Periodic vehicle inspections . <br /> 15 <br />