Laserfiche WebLink
Dust Mitigation Measures Page 2 <br /> (for Construction Sites) <br /> governing body, to remove silt which may have accumulated from <br /> construction activities. <br /> ► During rough grading and construction, access to the site should require <br /> the building of an apron into the project site from adjoining paved <br /> roadways. The apron should be paved or have a petroleum-based <br /> palliative' applied. <br /> Ozone Precursors- At all times, ozone precursor emissions should be controlled by the <br /> following methods: <br /> ► All internal combustion engine driven equipment should be properly <br /> maintained and well tuned according to manufacturer's specifications. <br /> ' Use of petroleum-based palliatives shall meet the road oil requirements of the <br /> District's Rule 4641 - Cutback Asphalt Paving Materials. <br /> Revised 1/15/93 <br />