Laserfiche WebLink
Describe off-site hauling of sand, aggregate ore, waste, or other <br /> mined material? x Yes No If Yes , specify: Intermittent operation <br /> A. Number of one-way truck trips per day: Peak 50 Average 40 <br /> B. Number of one-way truck trips per week: Peak 200 Average 150 <br /> C . Primary public roads used for hauling : N/A <br /> Est. 30 weeks per year. <br /> Describe proposed on-site and off-site road improvements : <br /> A. On-site Width 30 Ft. Surface Dirt - Watered w/Dust Palative <br /> Location S.E. Corner and N.W. corner of site to river. <br /> B. Off-site Width None Surface <br /> Location <br /> Describe the mined material recovery process (type of process , method, <br /> size and type of crushing equipment ) : All processing will be done at the <br /> existing C.C.W.C. Featherstone Plant_.Narth of the Mokelumne River. <br /> Location of the recovery process (es ) : Same as above. <br /> Mining Activities Operating Hours Days of the Week <br /> Blasting None <br /> Off-site hauling 6 AM to 6 PM Mon. thru Fri. <br /> Ore extraction None <br /> Crushing/processing 6 AM to 6 PM Mon. thru Fri. <br /> Other ( specify ) at existing plant north of river <br /> Declared Emergency As Necessary As Necessary <br /> Industrial „pater requirements : <br /> Amount required per day 10,000 Gal. <br /> Source- Featherstone Plant north of Mokelumne River (existing well ) <br /> Source of domestic water : <br /> Private well Water district (specify which ) <br /> Other Insulated Plastic Barrel <br /> Method of sewage disposal : <br /> Septic system Sewer district ( specify which ). <br /> Holding tank Other Portable Toilet <br /> Application Form <br /> Quarry Excavation - 4 - (3/89 ) <br />