Laserfiche WebLink
Schedule: <br /> -Mitigation fee program shall be negotiated prior to project construction. <br /> Monitoring: <br /> -None necessary. <br /> 2. Project trucks shall comply with all applicable local, state, and federal load <br /> limitation requirements. <br /> Implementation Responsibilities: <br /> -Applicant complies with load limitation. <br /> Schedule: <br /> -Ongoing. <br /> -Monitoring: <br /> -Applicant makes records available to the County to confirm compliance with load <br /> limitations. <br /> 8.5 Air Ouality <br /> Mitigation 1. - Water or other dust suppressants shall be applied to all working surfaces <br /> and on-site service roads at least twice per day, and in a large enough quantity so that <br /> the surface of the soil is moist. <br /> The applicant shall maintain proper records which shall be available for scheduled or <br /> unscheduled inspection by the County and the Air Pollution Control District (APCD). <br /> 138 <br />