My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013248
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
17749
>
2600 - Land Use Program
>
QX-90-1
>
SU0013248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:21 AM
Creation date
5/8/2020 10:56:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013248
PE
2600
FACILITY_NAME
QX-90-1
STREET_NUMBER
17749
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
Zip
95227-
APN
01922024
ENTERED_DATE
5/6/2020 12:00:00 AM
SITE_LOCATION
17749 E HWY 88
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(6.4 acres)(I.2 tons/acre/month)(1 month/30 days)(2000 lb/ton)(.50) = 256 lbs/day TSP <br /> (256 lb/day * 150 days/yenr * 1 ton/2000 lb= 19.2 tonslyear TSP <br /> Assume that the PMl0 content of the dust emissions is 509 (conservative since no soil silt data): <br /> 50% * 256 lbs/day— 128 lbs/day PM 10 <br /> 50% * 19.2 tons/year=9.6 tons/year PM10 <br /> D. FUGPTVE DUST FROM STORAGE PILES <br /> PM 10 Emission Factors from AP-42, Section 8.19.1 (Sand and Gravel Processing): <br /> Active Day/a/: 6.3 Ib/acre/day <br /> Inactive day lbl: 1.7 lblacro/dny <br /> /at: Includes the following distinct source operations in the storage cycle: (1) loading of aggregate ontop <br /> storage piles (batch or continuous drop operations), (2)equipment traffic in storage areas, (3)wind erosion <br /> Of pile (batch of continuous drop operations). Assumes 8 to 12 hours of activity/24 hours. <br /> lb/: Wind erosion only. <br /> There will be no storage piles at the extraction site. <br /> The processing site will have 4 to 5 acres of active stroage piles, depending on season and production. <br /> 4.5 acres *6.3 lblacre/dny * 150 days =4725 lblday PM-10 <br /> 4 acres * 1.7 Ib/acre/dny *215 days = 1462 lb/day <br />
The URL can be used to link to this page
Your browser does not support the video tag.