Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> SU-89-2 <br /> 11 . All utilities shall be underground. Easement for utilities <br /> shall be provided as required by the public utility <br /> companies. <br /> 12 . Circulation plan shall be revised to conform to local street <br /> design standards. ( 250 ' minimum centerline radius and <br /> secondary access requirements ) <br /> c : Manuel Lopez <br /> Deputy Director/Development <br /> s <br /> 3 <br />