My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
0
>
2900 - Site Mitigation Program
>
PR0507793
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 11:44:39 AM
Creation date
5/8/2020 11:25:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0507793
PE
2960
FACILITY_ID
FA0007764
FACILITY_NAME
COUNTY RIGHT OF WAY
STREET_NUMBER
0
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
CURRENT_STATUS
01
SITE_LOCATION
THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> 41N. c <br /> 0 COUNTY OF SAN JOAQUIN <br /> THOMAS R.R.FUNN <br /> a DEPARTMENT OF PUBLIC WORKS I;iEAI.1N DEPUTY DIRECTOR <br /> P.O.BOX 1810-1810 EAST HAZELTON AVENUE 1l 1CF MANUEL LOPEZ <br /> STOCKTON,CALIFORNIA 952@� U1a DEPUTY DIRECTOR <br /> •p ;5 P• 209/468-3000 �C .�i� �t 14 STEVEN WINKLER <br /> 4�TFORa` FAX:209/468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> December 26, 1997 <br /> Ms. Mary Meays, Senior REHS <br /> Site Mitigation Unit <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> SUBJECT: INTERSECTION OF THORNTON ROAD AND WALNUT GROVE ROAD <br /> IN THORNTON, CALIFORNIA 95686 <br /> Enclosed is the "Soil Contamination Containment Action Plan" propi Ised by the Department <br /> of Public Works' for Thornton Road. Please certify that the Action Pan is approved by <br /> PHS/EHD and return the original to our office. <br /> The construction work shall resume on December 29, 1997, as weath r permits. We request <br /> PHS/EHD staff to assist the Engineer at the site to monitor soil conta nination, as agreed, per <br /> our telephone conversation on December 24, 1997. <br /> If you have any questions, please call me at(209) 468-3030. <br /> Very truly yours, <br /> L-C- <br /> HAI K. LE <br /> Assistant Engineer <br /> HKL:gn <br /> FE-9 160.G1 <br /> Enclosure <br /> c: Pete Martin, Senior Civil Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.