My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2900 - Site Mitigation Program
>
PR0507911
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 11:58:50 AM
Creation date
5/8/2020 11:28:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0507911
PE
2950
FACILITY_ID
FA0007834
FACILITY_NAME
CIRCLE K #8671
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W , <br /> M <br /> August 13 , 2009 <br /> I Page 2 <br /> APPLICABLE <br /> RATIONALE DESCRIPTION OF REASON/RATIONALE <br /> CHECK X <br /> Assessment Incomplete <br /> WDR Permit Requirement <br /> X Well Being Sampled During Remedial Action for Progress Assessment <br />! Well Being Sampled For Free Product Evaluation and Reduction Verification <br /> Well Being Sampled Within First Year of Being Installed <br /> i Well Being Sampled for Post- Remedial Action Verification Monitoring <br /> Well Has Not Shown Reliable Consistency Yet To Warrant Reduction in <br /> Sampling Frequency <br /> Well Is Last Point of Monitoring Prior to possible impact to Receptor <br /> Other <br /> Note: ' = Indicates applicable reason or rationale for at least one well at the site being monitored at a frequency other <br /> than semi-annual. <br /> For additional details on a per well basis , refer to the attached Groundwater Monitoring <br /> Schedule spreadsheet. <br /> Based on the proposed sampling frequency at the Site, the recommended Groundwater <br /> Monitoring Report submittal frequency is summarized as follows : <br /> SAMPLING REPORTING REPORT DUE DATE <br /> PERIOD FREQUENCY <br /> Quarterly* Quarterly 30th day after period . <br /> Note: * = may not apply to all wells; see attached spreadsheet. <br /> If you should have any questions , please contact me at 916-558-7604 or <br /> Eric.G .Hetrick@contractor.conocophi Ili ps . com . <br /> Sincerely, <br /> Eric Hetrick <br /> ConocoPhillips RM &R Site Manager <br /> Attachment: Groundwater Monitoring Schedule <br /> cc: TRC — Anju Farfan <br /> Stantec — Mark Bare <br />
The URL can be used to link to this page
Your browser does not support the video tag.