My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010555
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2900 - Site Mitigation Program
>
PR0507911
>
ARCHIVED REPORTS_XR0010555
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 12:23:32 PM
Creation date
5/8/2020 11:35:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010555
RECORD_ID
PR0507911
PE
2950
FACILITY_ID
FA0007834
FACILITY_NAME
CIRCLE K #8671
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/17/2003 10 51 9168610430 SECQR PAGE 03/13 <br /> t <br /> GENERAL PROVISIONS <br /> 1 VALiDATIONIREVOCATION—This permit Is not valid unless signed by the Public Works Director or his authorized representative This permit m non- <br /> nderable and is void If work Is not completed prior to expiration date An extension may be granted if such is requested forty-eight(48)hours before the <br /> sand expires <br /> 2 ACCEPTANCE OF PROVISIONS—It is understood and agreed by the penrlitee that the performing of any work under the permit shall constitute an <br /> acceptance of the provisions <br /> 3 KEEP PERMIT AT JOBSiTE—The permit and control number shall be kept on the Iobsite and shall be shown to any representative of the City requesting <br /> venficatlon of permit issuance <br /> 4 INSPi"CTION AND APPROVAL—A minimum of 24 hours notice shall be required prior to placing any backfill.Connection to any existing facility,or the <br /> placement of any concrete or amphph paving Inspection shall not be deemed a waiver on the part of the City of the right to demand eerrectlon of defects <br /> discovered at a subsequent date <br /> 5 STANDARD PLANS�ND SPECIFICATIONS—All work shall conform to the City of Stockton Standard Plans and Speclticstions <br /> S SURVEY MONUMENT PRESERVATION—Any monuments including,but not limited to, chisel Grosses,witness Earners, and iron pins that control the <br /> location of subdivisions,tracts, boundaries,property lines Toads,streets, or provide survey controls,and that may be disturbed or destroyed during <br /> construction,shall be referenced by a hcogsed lend surveyor and reset in the surface of the new con4tructlon or set a permanent witness monument <br /> Corner records or Records of Survey shall be filed as required (Califorilia Business and Professions Code 8771 and California Streets and Highways <br /> Code 732 5, 1492 S. 1810 5) <br /> MINIMUM INTERFERENCE WITH AND PROTECTION OFTRAFFIC—AEI worts shall be planned and carried out so theta will be the least possible <br /> inconvenience to the traveling public Placing of lights,barricades,warning slgns and other safety devices required for public safety shall be the <br /> __,xpapansibriily of the permittee All work-zone traffic controls shall be in accordance with the most current revision of Chapter 5 of the State of California <br /> liiarlment or Transportation Traffic Manual <br /> 3 STANDARD WORKING HOURS--All work shall be restricted to the hours between 8 30 a m and 4 30 p iii ,except on arterials and collectors where the <br /> work is limited to the hours between 9 00 a On and 3 00 p m,unless otherwise rioted an this permit <br /> 9 FAILURE TO COMPLY WITH GENERAL PROVISIONS—The permlttee agrees to reimburse the City for performing all work and furnishing all materials to <br /> correo any failure to comply with these provisions,as well as all applicable Cfly Ordinances and Standard Plans and Specifications currently in effect <br /> 40 NOTIFICATION OF UTILITY COMPANY—the permittee shall notify utility companies 48 hours prior to beginning any construction,which may involve <br /> underground or overhead facilities and will pay all expenses for any removal or relocation necessary Valves an water mains may not be turned oft without <br /> 4ROmission of the utility company involved <br /> TIFICATION OF POLICE, FiRE AND PUBLIC WORKS DEPARTMENTS—When streets are to be blocked the Police, Fire and Pubic Works <br /> Departments are to be notified each day the street rs to be blocked and/or when traffic is delayed or hindered Access to fire hydrants shell be maintain <br /> at alt tunes Streets will not be closed without prior approval of City Traffic Engineer and Permit Engineer <br /> 12 CLEANUP OF JOBSITE—The permittee will remove any refuse material from the lobs4e within three days after completion of(tie work <br /> 13, DELINQUENT BILLS—Failure to pay any delinquent bill accrued under any previaUs permit issued by the Public Works department will be cause for <br /> rendering the applicant ineligible for any other permit from the Public Works Department until such bill is paid <br /> 14 MEETING EXISTiNG IMPROVEMENT—The permittee shall be responsible for meebng all adjacent frontage Improvements such as paving and sidewalks <br /> 15, PARKING METER AND TRAFFIC SiGN REMOVAL—The permittee shall contact either the Traffic Maintenance Supervisor at(209)937.7408,or the <br /> Senior Public Works Supervisor at(209)937-8534 of the Public V&rks Traffic Devices Section,at least 48 hours;prior to any parking meter or trafllc sign <br /> removal, <br /> ""IMPORTANT — <br /> MANDATORY Encroachment Permit Procedures <br /> To provide a more efficient and economical inspection service for Encroachment Permit construction the following procedure shall be followed by all per'mltteas <br /> I Notify the Permit Engineer,(209)937.8366,to obtain a control nUrnber,no less than 24 hours,but not to excess of 72 hours prior to the start of work, <br /> and prior to any required inspections as rdenbfied below If work does not begin w9hln 72 hours of the issuance of a control number,the control <br /> number will be Invalid and the perutrae shall call for anew control number (For City Capital Improvement Prnjecta or subdivision improvements, <br /> permlttge shall contact the assigned City Project Engineer at(209)837-8411 for specft instrUchorts prior to the beginning of any work) <br /> 2 Discuss with the Permit Engineer or Inspector any unusual or dt ieuk features of the constfucbon <br /> 3 Advise Permit Engineer of name and phone number of contact person for the project prior to beginning work <br /> 4 Nottfy Permit Engineer one day in advance to catioel a scheduled Inspat tlan or to request an additional or earlier inspection <br /> 5 Notify the PerrnR Engineer upon completion of construction at(209)937$366 <br /> REQUIRED INSPECTIONS <br /> t.tsted balow are several types Of construction and points at which Inspections must be made,prior to continuing construction cperdWrt Unauthortzed <br /> contlnuance of construction beyond and inspection point may result In rejection of all work <br /> • CONCRETE PIPE INSTALLATION <br /> 1 Grade and excavate before forming 1 Excavatwn and bedding <br /> 2 Forming befpre placement of concrete 2 Pipe Installation and/or utility connections <br /> 3 Beginning and during asphalt paving 3 SBckfill(compaction test may be required) <br /> 4 Cleanup and final approval 4 Beginning and during asphalt paving <br /> 5 Final approval <br />
The URL can be used to link to this page
Your browser does not support the video tag.