Laserfiche WebLink
�6frr1FR-RYAN INC. GR Job# 20-602958 <br /> F. In-Tank Gauging/51R Equipment: ❑ Check this box if tank gauging is used only for invent t ���� <br /> ❑ <br /> Check this box if no tank gauging or SIR equipment i ins II <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: MAiR 2 7 2015 <br /> ❑ es [] o Has all input wiring been inspected for proper entry and termination,including testing for ground faults? ee <br /> (� Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? :A <br /> ❑ Yes ❑ No' Was accuracy of system products level readings tested? - <br /> ❑ Yes ❑ No' Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No' Were all probes reinstalled properly? <br /> ❑ Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak DeteCtorS(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑ es ❑ o For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(check all <br /> ❑ N/A that apply) Simulated leak rate: ❑ 3 g.p.h. ❑ 0.1 g.p.h. ❑ 0.2 g.p.h. <br /> ❑ Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> [] Yes ❑ No' Was the testing apparatus properly calibrated? <br /> 0 Yes (] No' For Mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes D No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> ❑ N/A Disconnected? <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑ N!A fails a test? <br /> ❑ Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ❑ Yes ❑ No' were all items on the equipment manufacturers maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will corrected. <br /> G. Comments: <br /> Tested Sensors ONLY(that were replaced) <br /> Monitoring System Certification Page 3 of 4 12/07 <br />