My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
902
>
2900 - Site Mitigation Program
>
PR0516350
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 12:28:58 PM
Creation date
5/8/2020 12:00:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0516350
PE
2950
FACILITY_ID
FA0012574
FACILITY_NAME
LEWIS MANOR - MUNI MW (4)
STREET_NUMBER
902
Direction
W
STREET_NAME
12TH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23229069
CURRENT_STATUS
02
SITE_LOCATION
902 W 12TH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
doing all the work involved in placing and compacting the Asphalt concrete, including <br /> applying the prime coat or paint binder, complete in place, all as specified in the <br /> Standard Specifications, these special provisions, and as directed by the Engineer, shall <br /> be considered as included in the prices paid for demolition of the existing pump houses <br /> and no additional compensation will be allowed. <br /> SECTION 9 - LEWIS MANOR WATER WELL AND NESTED MONITORING WELL <br /> DESIGN AND CONSTRUCTION: (Bid Item Nos. 1 and 2) <br /> PART 1 - GENERAL <br /> The Contractor shall drill a well pilot hole and design a new Production Well to be <br /> constructed on the Lewis Manor Well Site. The Contractor shall also design a Multiple <br /> Completion (nested) Monitoring Well on the same site. The design of both shall be in <br /> accordance with these specifications and the requirements of the State of California, <br /> Department of Water Resources Bulletin 74 (SCDWRB-74). After approval by the <br /> Engineer, the Contractor shall construct the new production well and Monitoring Well <br /> where indicated on the Site Location Pian (herein attached), complete and in <br /> accordance with the requirements of SCDWRB-74. The completed Production Well <br /> shall be video inspected using a camera with side scan capabilities. <br /> 1.01 SUMMARY <br /> A. Section Includes: <br /> 1. The furnishing of all labor, supervision, material, transportation, tools, <br /> supplies, plant, equipment and appurtenances necessary for the <br /> complete and satisfactory design, construction, development and testing <br /> of a new production (water supply) well located as shown and described <br /> in these Specifications. <br /> 2. The furnishing of all labor, supervision, material, transportation, tools, <br /> supplies, plant, equipment and appurtenances necessary for the <br /> complete and satisfactory design, construction, development and testing <br /> of a new Nested Monitoring Well (multiple completion monitoring well) <br /> located as shown and described in these Specifications. <br /> 1.02 SCOPE OF WORK <br /> A. Production Well: (Bid Item No. 1) <br /> 1. The work includes the complete construction of a production water <br /> supply well that is gravel packed and provided with well casing and <br /> screen sections, developed and tested. The work includes: <br /> a. Drill a 12-inch-diameter pilot hole to a depth of 1,000 feet, or as <br /> directed by the Engineer. <br /> b. Perform E-log, sieve analyses, water quality sampling, and well <br /> design. <br /> Division III- 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.