Laserfiche WebLink
V %WW <br /> K. Report Required: The Contractor shall file with the State of California, <br /> Department of Water Resources and San Joaquin County Department of <br /> Health Services, Environmental Health Division, and other required <br /> Agencies, such reports ion of which a mayReport of Complebe req ti ng and4supplemental <br /> Engage in Const <br /> reports as may be required. <br /> L. Material Submittal: Submit data to show that all materials to be used in <br /> construction of the well conform to the Specifications. <br /> M. Samples: Furnish, without additional cost to the City, such quantities of <br /> construction materials as may be required by the Engineer for test purposes. <br /> The Contractor shall cooperate with the Engineer and furnish necessary <br /> facilities for sampling and testing of all materials and workmanship. All <br /> materials furnished and all work performed shall be subject to rigid <br /> inspection, and no material shall be used in the construction work until it has <br /> been submitted and favorably reviewed by the Engineer. <br /> 1.05 QUALITY ASSURANCE <br /> A. The Contractor shall procure all permits, certificates, <br /> ���Dimply vvd'ith all federal,censes required <br /> state <br /> by law for the execution of this work. H <br /> and local laws, ordinances or rules and regulations relating to the <br /> performance of the work, including the requirements of the State of California <br /> Department of Water Resources Bulletin No. 74. The cost of all permits, <br /> certificates, and licenses required by law for the completion of the described <br /> work shall be considered o ked as involved included <br /> andd no additioncesal compensation will be <br /> aid for the various <br /> contract items o <br /> allowed. <br /> 1.06 NOTIFICATION <br /> A. The Contractor shall bf responsible <br /> especific to gi s as notice <br /> t follows: Engineer in writing <br /> prior to performance o sp Pe <br /> 1 r At least seventy-two (72) hours advance notice of intent to start drilling <br />[ operations of pilot hole. )c� <br /> f 2. At least seventy-two (72) hours advanced notice of intent to start drilling <br /> operations of the Production Well. <br /> 3. At least seventy-two (72) hours advanced notice of intent to start drilling t <br /> operations of the Nested Monitoring Well. r <br /> B. The Contractor shall telephone the Owner and Engineer daily with a report <br /> on the status of the work and the expected work to be accomplished in the <br /> next 24 hours. <br /> PART 2 - PRODUCTS <br /> 2.01 CASING AND SCREEN <br /> Division III- 15 <br />