Laserfiche WebLink
Quarterly Monitoring Report <br /> Fourth Quarter 2014 <br /> ' OAK RIDGE WINERY <br /> Lodi, California <br /> ' WKA No. 6364.07 <br /> December 18, 2014 <br /> ' 1.0 INTRODUCTION <br /> ' This Quarterly Monitoring Report (QMR) presents the results of the Fourth Quarter 2014 <br /> groundwater sampling and analyses at Oak Ridge Winery, LLC (Winery shown in Figure 1) as <br /> ' required by the California Regional Water Quality Control Board - Central Valley Region <br /> (RWQCB-CVR). The QMR is submitted pursuant to the RWQCB-CVR Waste Discharge <br /> Requirements (WDR) as specified in Monitoring and Reporting Program (MRP) Order No. 5-01- <br /> 172, dated June 14, 2001, and the Water Code Section 13267 Order, dated September 23, <br /> 2004. <br /> 2.0 PURPOSE <br /> The purpose of the monitoring activity was to evaluate the groundwater conditions in the vicinity <br /> ' of the wastewater treatment and land application areas operated by the Winery (Figure 2). The <br /> following presents the work conducted during this quarter: <br /> ' • Measure depth-to-groundwater (DTW) and calculate groundwater elevation at each <br /> monitoring well; <br /> ' • Purge each monitoring well in preparation of collecting groundwater samples; <br /> • Collect a set of groundwater samples from each monitoring well; <br /> • Submit each set of groundwater samples for laboratory analysis; and, <br /> ' • Prepare this Quarterly Monitoring Report. <br /> ' This QMR also includes a presentation of the results of analysis and statistical evaluation of the <br /> data that were prepared pursuant to MRP Order No. 05-01-172. <br />