My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2373
>
2800 - Aboveground Petroleum Storage Program
>
PR0523161
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2020 2:58:18 PM
Creation date
5/8/2020 1:25:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0523161
PE
2832
FACILITY_ID
FA0009394
FACILITY_NAME
MAXIM CRANE WORKS
STREET_NUMBER
2373
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
2373 E Mariposa Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendments to the plan made to address changes of this nature are referred to as technical <br /> amendments, and must be certified by a professional engineer using the form presented in Appendix A. <br /> Non-technical amendments can be completed by the facility owner and/or operator and must be <br /> documented in this plan. Non-technical amendments include the following: <br /> • Change in the name or contact information (i.e., telephone numbers) of individuals <br /> responsible for the implementation of this plan; or <br /> • Change in the name or contact information of spill response or cleanup contractors. <br /> Maxim Crane Works must make the needed revisions to the SPCC Plan as soon as possible, but <br /> no later than six months after the change occurs. The plan must be implemented as soon as possible <br /> following any technical amendment, but no later than six months from the date of the amendment. The <br /> Shop Superintendent is responsible for initiating and coordinating revisions to the SPCC Plan. <br /> 2. Scheduled Plan Reviews <br /> In accordance with 40 CFR 112.5(b), Maxim Crane Works will review this SPCC Plan at least <br /> once every five years (in the past, such reviews were required every three years). Revisions to the plan, if <br /> needed, are made within six months of the five-year review. A registered Professional Engineer certifies <br /> any technical amendment to the plan, as described above, in accordance with 40 CFR 112.3(d). This <br /> Plan is dated July 14, 2006. The next plan review is therefore scheduled to take place on or prior to July <br /> 14, 2011. Amendment 1, Plan review October 0, 2012. <br /> 3. Record of Plan Reviews <br /> Scheduled reviews and plan amendments are recorded in the Plan Review Log (Table 1). This <br /> log must be completed even if no amendment is made to the Plan as a result of the review. Unless a <br /> technical or administrative change prompts an earlier review of the Plan, the next scheduled review of <br /> this plan must occur by July 14, 2011. Amendment-1, Plan reviewed October 9th, 2012 <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.